  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • IMPC
    Design improvements and implementation of high flow Jones® Whims in a hematite processing plant

    By Mario Gerards, Sergej Podkow, Marco Steinberg

    "The JONES® WHIMS technology is based on the magnetic separation process and is widely used for the recovery of magnetically susceptible iron ore particles. The conventional machine design is well-kno

    Jan 1, 2014

  • NIOSH
    Design In Weak Rock Masses: Nevada Underground Mining Operations

    By Pakalnis Rimas, Lyndon Clark, Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate data on wea

  • CIM
    Design in Weak Rock Masses: Nevada Underground Mining Operations

    By Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate data on wea

    May 1, 2006

  • SME
    Design In Weak Rock Masses: Nevada Underground Mining Operations Nevada Underground Mining Operations

    By Rimas Pakalnis, Lyndon Clark, Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate data on wea

    Jan 1, 2005

  • CIM
    Design innovations in conveyor systems

    By Lloyd H. Yeomans

    "This paper will cover recent developments in conveyor applications with specific reference to capacities, bell speeds and distances. It will also discuss certain unique arrangements of horizontal, cu

    Jan 1, 1983

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • DFI
    Design Methodology for Multi-Facetted, Winged Steel Foundations

    By Phillip E. Glogowski, N. Catherine Bazan-Arias

    Steel foundations can be designed to cross-sectional configurations ranging from triangular and square to other multi-side shapes. Adding lateral extensions (hereby called wings) along the length of t

    Sep 8, 2021

  • NIOSH
    Design Methodology For Standing Secondary Roof Support Systems

    By Thomas P. Mucho, Thomas M. Barczak, Dennis R. Dolinar

    Maintaining ground stability in the gate roads, particularly the tailgate, has always been critical to the success of longwall mining, both in terms of safety and productivity. Several new support te

    Jan 10, 2000

  • SME
    Design Methodology of Pumpable J-Crib Stopping Wall and Jennmar High-Strength Stopping Panel Wall

    By Xiaoting Li, Richard Adasiak, Benjamin Mirabile

    Pumpable J-Crib stopping walls and Jennmar high-strength (HS) stopping panel walls are widely used for resisting high-ventilation air pressures and roof support in underground mines due to their insta

    Jul 1, 2023

  • SME
    Design Methodology Used for the Lake Mathews Outlet Facilities Project

    By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd

    The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of

    Jan 1, 1999

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • IOM3
    Design methods for controlled blasting

    By O. Dojcar

    Equations for calculating the parameters of controlled blasting (burden and spacing of boreholes and weight of the bottom charge) are derived and analysed on the basis of empirical values and made mor

    Dec 1, 1996

  • CIM
    Design Methods for DC Arc Furnaces to Enhance Furnace Integrity

    By Q. G. Reynolds, R. T. Jones

    The choice of furnace design parameters has a marked effect on the integrity of the furnace that is constructed. The design methodology for DC arc furnaces typically begins with the chemical reactions

    Jan 1, 2015

  • DFI
    Design Methods For Earthquake-Induced Pile Bending

    By George Mylonakis

    The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct

    Jan 1, 2002

  • IOM3
    Design methods to control violent pillar failures in room-and-pillar mines

    By R. K. Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard for miners and mine operators. This type of failure, termed a cascading pillar failure, occurs when one pill

    Jun 19, 1905

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • SME
    Design model for underground haulage systems

    By H. Sevim

    A new method of designing haulage systems, consisting of belt conveyors and hoists for underground mines is discussed in this paper. Efficient and economic design of such systems will prevent operatio

    Jan 1, 1987

  • TMS
    Design Modifications At Zaldivar To Reach Plant Capacity Production

    By C. García

    Several modifications to Zaldivar's original design have been made in order to reach the design cathode production. This paper describes the modifications to the crushing, leaching, solvent extra

    Jan 1, 1999