Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)By C. Dinis da Cama
In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat
Jan 1, 1984
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Front abutment effects on supplemental support in predriven longwall equipment recovery roomsBy Jeffrey M. Listak
This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u
Jan 1, 1989
-
Mine Pillar Stability Analysis Using Fem Methods - Two Case StudiesBy David H. Tang
Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite
Jan 1, 1990
-
An Application Of Fem Back Analysis Method To Mine RoadwayKnowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements
Jan 1, 1990
-
Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case StudiesBy John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
In-Situ Coal Strength Determination - Case StudiesBy Kot F. Unrug
Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo
Jan 1, 1995
-
Changes In The Seismic Properties Of The Cover Produced By Longwall MiningBy Guoqi He
Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within
Jan 1, 1989
-
The Effect Of Gas Pressure On Coal StrengthBy Najdat I. Aziz
There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens
Jan 1, 1996
-
The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian CoalfieldBy John A. Owsiany
The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid
Jan 1, 2001
-
Pillar Optimization For Initial Design And Retreat RecoveryBy Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003
-
Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal MiningBy Shosei Serata
The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe
Jan 1, 1986
-
Subsidence Prediction From The Beginning - Collie Coal Basin (Western Australia) (dce863fc-d411-440e-9991-cfa750adc084)By Ian Misich
Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialed the Wongawilli mining method. Because very little quantitativ
Jan 1, 1992
-
Geotechnical Mapping By Seismic Imaging In Underground MinesBy W. J. Mcgaughey
A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me
Jan 1, 1989
-
State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)By Alan A. Campoli
The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of
Jan 1, 1996
-
Planning And Design For Barrier Pillar Recovery Three Case HistoriesBy David A. Newman
Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu
Jan 1, 1995
-
Historical Perspective And Future Projection Of Longwall Mining In The United States (19eaaffe-326c-46a4-9a81-dc104b2df560)By Thomas M. Barczak
This report chronicles the historical development of longwall mining in the United States and speculates on future developments to the turn of the century. Five eras of technological development durin
Jan 1, 1992
-
A Case Study of Longwall Roof-Supports InteractionBy Y. H. Wang
During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research
Jan 1, 1986
-
Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In IllinoisBy G. C. Marino
The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e
Jan 1, 1990
-
Effects Of Subsidence On Steep Topography And Cliff LinesBy Don Kay
A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,
Jan 1, 1992