Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    ARD Remediation with Limestone in a CO2 Pressurized Reactor

    By Barnaby J. Watten, Sibrell. Philip L., Brian J. Vinci, Andrew E. Friedrich

    We evaluated a new process for remediation of acid rock drainage (ARD). The process treats ARD with intermittently fluidized beds of granular limestone maintained within a continuous flow reactor pres

    Jan 1, 2000

  • SME
    The Wesco Gasification Project - Coal Supply ? Introduction

    By Howard C. Homeyer

    Coal and water are the two basic external feedstocks required for a coal gasification project. The WESCO project in northwest New Mexico, a joint undertaking of Texas Eastern Transmission Corporation

    Jan 1, 1974

  • SME
    Influence Of Rock Properties And Mining Factors On Ground Subsidence

    By R. Krishna, L. A. Kumar

    The paper suggests a new empirical model for predicting mining subsidence. The parameters considered are Lithological Factor, which in this context meant percentage of sandstone, Rock Mass Factor (dep

    Jan 1, 1993

  • SME
    Improvements In Resource Recovery At Stauffer's Big Island Mine

    By J. F. T. Agapito

    Significant increases in extraction ratio on the order of six to eight percent, equivalent to as much as 142 t/m of panel advance, have occurred at the Big Island Mine during the last five years with

    Jan 1, 1988

  • SME
    How A Financier Can Handle The Mine Environmental Rehabilitation Costs: The Case Of The Ranger Uranium Mine, Australia

    By C. R. Tinsley

    In maybe the world's first in a mine project financing, a US $55 million Rehabilitation Indemnity was given on behalf of the banks in a US $250 million loan to develop the Ranger uranium mine, No

    Jan 1, 1992

  • SME
    Conveying Vs. Truck Haulage

    By P. W. Erickson

    Development of the Twin Buttes mine entailed the largest known preproduction stripping job in the history of mining. It linked earthmovers and conveyor belts in a new approach to development of a pit

    Jan 1, 1974

  • SME
    Interactions Between Anionic Collector And Alizarin Modifier In Dolomite/Francolite Flotation System

    By L. Xiao

    Using K-oleate as a collector and alizarin red S (ARS) as a modifying agent, selective depression of dolomite from francolite was achieved in alkaline medium (pH> 9.0). Interestingly. ARS was also fou

    Jan 1, 1988

  • SME
    Determination Of Friction Factor For Kentucky's Coal Mines

    A knowledge of airway friction factor (K-factor) is necessary to designing mine ventilation systems for least cost and optimum effectiveness. The friction factor used must be accurate and reliable to

    Jan 1, 1991

  • SME
    Surface Mine Irrigation At The San Juan Mine, New Mexico

    By Halter L. Gould

    Since the turn of the century there has been a marked increase in population, industrial and economic growth, and in energy requirements in the United States. During this time our energy needs have be

    Jan 1, 1978

  • SME
    Regulating Mechanism of the Coal‑Based Reduction Reaction Behavior of Jinchuan Ferronickel Slag: Equilibrium Phase Composition, Kinetics, and Phase Transformation

    By Yonghong Qin, Songbo Ma, Qi Zhang, Peng Gao, Jianwen Yu

    Herein, the coal-based reduction was proposed to utilize the ferronickel slag of Jingchuan company. An excellent index with metallization rate of 99.22%, iron grade of 77.91%, and iron recovery of 92.

    May 24, 2022

  • SME
    Noise Controls For Vibrating Screen Mechanisms

    By M. J. Lowe

    National Institute for Occupational Safety and Health (NIOSH) studies show that 43.5% of surveyed coal preparation plant workers had noise exposures exceeding the Mine Safety and Health Administration

    Jan 1, 2010

  • SME
    Role of processing temperature and time on the hydrothermal alteration of K-feldspar rock in autoclave

    By A. ALLANORE, OLIVEIRA M. DE, D. CICERI, D. P. CHEN

    The alkaline hydrothermal processing of K-feldspar rocks in an autoclave can be a pathway to synthesize a potassium fertilizer for tropical soils that is potentially cheaper and more efficient than tr

  • SME
    Sulfide Capacity Modeling Of FeOx-MO-SiO2 (MO=Cao, MnOx, MgO) Melts

    By B. Derin

    In this study, the Reddy-Blander model was applied to predict the sulfide capacity (CS) values of FeOx-CaO-SiO2, FeOx-MnOx-SiO2 and FeO-MgO-SiO2 ternary slags, which were experimentally studied in the

    Jan 1, 2011

  • SME
    A Comparison Of Different Water Sprays At High Pressures For Respirable Coal Dust Knockdown Ability In A Confined Chamber - SME Annual Meeting 2023

    By S. S. Klima, H. Jiang, T. W. Beck, Y. Zheng

    Researchers at NIOSH’s Pittsburgh Mining Research Division (PMRD) performed comparative testing of six different water sprays at pressures ranging from 689 kPa (100 psi) to 6,895 kPa (1,000 psi) in a

    Feb 1, 2023

  • SME
    Flotation Of Insoluble Slimes From Potash Ore

    Laboratory testing by the Federal Bureau of Mines has shown that the removal of insoluble slimes using selective flocculation and flotation is a viable method for treating low-grade potash ores which

    Jan 1, 1977

  • SME
    A Suggested Approach to Rock Characterization in Terms of Seismic Velocities

    By W. R. Dearman, N. Turk

    A seismic fissuration index (K) is defined as the ratio of the difference in the P and S wave velocities obtained when a dry rock specimen is tested both under a load equal to half the uniaxial compre

    Jan 1, 1986

  • SME
    Two-Seam Mining Stability at OCI’s Big Island Trona Mina

    By J. F. T. Agapito

    OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and

    Jan 1, 2000

  • SME
    Modular Carbon Adsorption Plant

    By K. R. McGinnis

    A major cost to a mining company is funding of an exploration program. It is a necessary cost to insure the company's future. But if the exploration effort does not discover an economic are body,

    Jan 1, 1988

  • SME
    Tunnelling for the Channel Tunnel Rail Link

    By David Court, Rab Brown

    The paper discusses the work in progress on the construction of the extension of the High Speed Rail line from the Channel Tunnel into the centre of London UK known as the “Channel Tunnel Rail Link” (

    Jan 1, 2003

  • SME
    Ground Freezing for Deep Shafts at the Mill Creek Tunnel Project

    By Richard Switalski, Mark R. Kritzer, Boro J. Lukajic, Robert Pintabona

    Ground freezing was chosen as an initial support method during construction of two deep shafts at the Mill Creek project. The Mill Creek, Phase 2 tunnel (MCT-2) is utilized to convey and store combine

    Jan 1, 2003