Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison of Different Blast Design Models, Using a Blasting SoftwareBy Roozbeh Afzali
Designing an appropriate tunnel blasting pattern reduces the cost of rock breakage and subsequent operations such as loading, haulage and support of tunnels. For that reason, we developed a software t
Jan 1, 2008
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct TunnelBy C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern OntarioBy Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey
Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter
Jan 1, 2007
-
Raw Water Tunnel Condition AssessmentBy Rafael C. Castro
As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In
Jan 1, 2008
-
Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical ApproachBy John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007
-
The Big Walnut—A Planned ApproachBy Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic PressuresBy George Watson, Gu Quanzhong, S. Gerard Sawyer
Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be
Jan 1, 2005
-
Large-Diameter Tunneling Collapses: Recovery Design and ExecutionBy Bradford F. Townsend
A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed
Jan 1, 2008
-
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode IslandBy Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert
Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his
Jan 1, 2007
-
Underground Construction Photography: Documenting a Success StoryBy Susan L. Bednarz
Recent advances in digital cameras and image processing allow photographers to produce excellent high-resolution action shots in low light and high contrast conditions commonly encountered underground
Jan 1, 2008
-
Estimating Rock Tunnel Water Inflow—IIBy Ronald E. Heuer
A 1995 RETC paper of similar title presented a method for estimating rock tunnel water inflow based on semi-empirical correlations with borehole water pressure tests. Since that time the author has fo
Jan 1, 2005
-
Shaft Sinking at the Seymour?Capilano Filtration PlantBy Andreas Prucker
The Greater Vancouver Water District (GVWD) is currently constructing the largest water treatment plant in Canada. As part of this treatment scheme twin water transfer tunnels are being constructed. W
Jan 1, 2008
-
A New Model for Characterizing the Cobble and Boulder Fraction for Soft Ground TunnelingBy Glen Frank, David R. Chapman
Determining the number of boulders and cobbles that will be encountered in the tunnel envelope is one of the most difficult problems confronting the geotechnical engineer in the design of tunnels in g
Jan 1, 2005
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Pre-conditioning/Pre-excavation Grouting of the Soils Prior to Tunneling Below Highways and Railways: Case Histories from the Past DecadeBy Alex Naudts
Pre-excavation grouting is a predictable and reliable technique performed to prevent or minimize settlement in advance of, or during the tunneling operation. It safeguards the infrastructure above the
Jan 1, 2008
-
Record Attendance Turns Out For 2008 Fox ConferenceThe state of the tunneling and underground construction industry and the advancements of the industry?s biggest machines were the main topics at the 2008 edition of the UCA of SME?s annual George A. F
Jan 1, 2008
-
A protocol and standard for mine ventilation studiesFlawed mining studies have been major contributors to poor investment decisions in mining for many years, contributing to the long period of poor industry profitability. Most of the major mining house
Jan 1, 2009
-
Using Optimizing Control System At CVRD’s Pelletizing PlantsBy Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi
Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in
Jan 1, 2005