Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
St. Peter Sandstone Mineral Resource Evaluation, MissouriBy J. G. Davis
The St. Peter Sandstone is typically a well-sorted, friable, ultra-pure, fine- to medium-grained, quartzose sandstone with silica content higher than 99 weight percent in places. The sand grains are w
Feb 27, 2013
-
Regrind Mills: Scaleup Or ScrewupAs ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind
Jan 1, 2011
-
Deterministic And Stochastic Water Balance Modeling Of The Gilt Edge Mine Superfund Site, South DakotaBy K. Wangerud, B. S. Caruso
A water balance model with deterministic and stochastic components was developed and used for the Gilt Edge Mine Superfund Site, South Dakota, to evaluate risks of contaminated runoff discharging to s
Jan 1, 2002
-
Practical Aspects Of Cathodoluminescence Petrography Applied To Alkali Syenite And CarbonatiteBy H. L. Barwood
Luminescence excited by electron bombardment, or cathodoluminescence (CL), is a very useful tool in petrographic examination of rocks, minerals and ores. Differences in luminescence colors and intensi
Jan 1, 2001
-
Using Principles Of Inherent Safety In Design Of Hydrometallurgical Solvent Extraction PlantsBy L. J. Moore
Introduction Hydrometallurgical solvent extraction (SX) processes – featuring large quantities of combustible or flammable organic solvents - are common in the mining industry for recovering non-fe
Jan 1, 2006
-
Decline Development At The Lakeshore PropertyBy Robert S. Hendricks
LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered
Jan 1, 1997
-
Application of Predictive Maintenance Techniques for Large Electric Mining Shovels – Preprint 97-205By Michael Lenz
Predictive maintenance technologies including vibration analysis, tribology, infrared thermography, ultrasonic detection, and electrical measurements have been applied to large electric mining shovels
Feb 24, 1997
-
Mitigation Measures To Minimize Subsidence Damages Caused By Longwall Mining To Historic Structures & Their EffectivenessBy K. Kohli
A case study involving a historic structure undermined by longwall mining is presented in this paper. The location of this study is in South Western-Pennsylvania; USA. The structure is 150-years old a
Jan 1, 2002
-
Innovative Mining Systems For Low-Cost Production In Very Thick Alluvial DepositsBy G. Goellner
The thick alluvial sand and gravel deposits along the base of the San Gabriel mountain range in Southern California area have been mined for construction aggregates for over 100 years. Encroachment of
Jan 1, 2004
-
Regulatory Toxicology And Pharmacology - Session VI: Risk Assessment Of Asbestos And Other Fibrous Mineral Particulates: Rapporteur?s Report1. Paper1?Identification and enumeration of asbestos fibers in the mining environment: mission and modification to the federal asbestos standard Arthur M. Langer Asbestos-related disease is increa
Jan 1, 2008
-
Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern PennsylvaniaBy A. Iannacchione
Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where
Feb 27, 2013
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Environmental Issues For The Reclamation Of Abandoned Coal Mines In The Appalachian Coal Fields – Preprint 97-179By Anthony B. Szwilski, Dalip Sarin, Richard D. Begley
This paper will present the results of an analysis of several abandoned coal mine projects and includes field data for over a dozen different reclamation projects recently completed in the state of We
Feb 24, 1997
-
Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and TunnelBy David Belknap, Clay Haynes, David Egger
Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w
Jan 1, 2005
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Magmont Mine Closure Under Missouri Metallic Minerals ActBy M. F. Bradley, G. M. Schoen
The Magmont Mine, a 50/50 venture between Cominco American Incorporated (the Operator) and Dresser Industries, Inc., (Halliburton), is a metallic mining and milling facility in the new lead belt of Mi
Jan 1, 2001
-
Evaluation Of Smoke Detectors For Use In Underground Mines - Preprint 09-072By C. D. Litton
Laboratory experiments were conducted to determine the responses of a prototype smoke detector and a commercially available photoelectric smoke detector to smoke particles generated from various combu
Jan 1, 2009
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
The Design and Use of Steel Fiber Reinforced Concrete SegmentsBy Michael R. King
The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared
Jan 1, 2005