Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A Novel Methodology To Locate An Abnormal Airflow In Underground Mine Ventilation Networks - SME Annual Meeting 2022

    By L. Zhou, D. Bahrami

    Mine ventilation is one of the most important aspects of mining operations in underground mines. It is critical to maintain and deliver required fresh air to the active areas to reduce the risk of ove

    Mar 2, 2022

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    The Versatility of Tunnelling and Trenchless Methods for Sustainable Grid Construction - RETC2023

    By M. Peters, P. Schmäh

    The development of renewable energies and a sustainable power grid are the challenges for future energy supply. Underground cables will replace the vulnerable overhead lines, because of their safety b

    Jun 13, 2023

  • SME
    Planning for Sound Transit’s Proposed LINK Light Rail Expansion in Seattle Washington - RETC2023

    By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava

    Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle and Ballard. These connections include considerations fo

    Jun 13, 2023

  • SME
    Driving Forward The European Industrial Minerals Industry's Commitment To Sustainable Development

    By S. T. Murray

    The European industrial minerals industry and its markets are largely self-sufficient. The companies who are members of the Industrial Minerals Association (IMA-Europe) number around 150 contributing

    Jan 1, 2003

  • SME
    GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?

    By Antonio De Biase

    In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t

  • SME
    Development of Cyanide Leaching Processs For Small High Grade Gold and Silver Deposits

    By Michael Harris, David Mosch

    The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing

    Jan 1, 1987

  • SME
    Remediation Of Historical Smelter Contamination Midvale Slag Superfund Site - Operable Unit One Midvale, Ut - Introduction - Preprint 09-012

    The Midvale Slag Site covers 300 acres in Midvale, Salt Lake County, Utah. Midvale (population 10,000) is part of the Salt Lake City metropolitan area (population 936,000). Between 1902 and 1971, Un

    Jan 1, 2009

  • SME
    Evaluation Of Blast Fragmentation In Quarries Nearby Istanbul ? Introduction

    By T. Hudaverdi

    Control of the particle size distribution of a muckpile after blasting is always an important subject for mining industry. Blasting has a significant impact on downstream processes such as loading, cr

    Jan 1, 2012

  • SME
    Ergonomic Interventions At Unimin (a8427aad-fa40-4708-ba18-5e74f8b6935f)

    By A. Mayton, W. Porter, A. O’Brien

    In 2004, management at Unimin’s Gleason, TN operation began implementing ergonomic interventions specifically targeted to reduce risk of musculoskeletal injuries (MSIs). Together with corporate and s

    Jan 1, 2007

  • SME
    TARP — The Des Plaines Tunnel System (North Leg) A Case History

    By Robert Rautenberg, Paul McDermott

    This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7

    Jan 1, 1997

  • SME
    Interaction Of Grade And Metallurgy Simulations In Assessing Uncertainty For Ore Routing Determinations In The Gold Quarry Deposit

    By M. Baumann

    Introduction Gold Quarry is one of the largest gold deposits in Nevada, located along the Carlin Trend, approximately seven miles north of Carlin, NV. Owned and operated by Newmont Mining Corporati

    Jan 1, 2007

  • SME
    Significant Developments In Dry Rare-Earth Magnetic Separation - Preprint 09-004

    By M. Dobbins

    The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980?s began a new era of dry magnetic separation. The RER units quickly became the separator of choice with

    Jan 1, 2009

  • SME
    Performance Characteristics For Welded Wire Screen Used For Surface Control In Underground Coal Mines - Preprint 09-104

    By D. R. Dolinar

    The fall of small pieces of rock between roof bolts causes over 80 pct of the ground fall injuries in underground coal mines. Roof screen, if installed on the bolting cycle, can significantly reduce

    Jan 1, 2009

  • SME
    Underground Diesel Use – Fuel For Thought

    By J. A. L. Campbell

    The Galatia Mine is a dual-seam underground coal mine located in Saline County, IL. In 1984, it became the first coal mine to be permitted by the Illinois Department of Mines and Minerals to operate d

    Jan 1, 1993

  • SME
    Mining By Computer – Is It Really the Way of the Future?

    By Badiozamani Khosrow

    Introduction The mining industry has been using computers since the late 1950s. Despite this early start, the use of mine planning software is not a common practice in many operations. But the trend

    Jan 9, 1984

  • SME
    Geolocation for Underground Coal Mining Applications: Classi?cation of Systems

    The ability to track miners and communicate with them while they work in underground coal mines is important during normal daily operation, and critical in emergency conditions. This was evident durin

  • SME
    Implementing and using a fully integrated maintenance management information system

    By Paul D. Tomlingson

    Part two of this two-part series covers the use of an integrated information system with administrative information, including error and absentee reports as well as open work files. Part one (ME, J

    Jan 8, 1985

  • SME
    Implications Of Recent NIOSH Tracer Gas Studies On Bleeder And Gob Gas Ventilation Design (57921107-e7df-446a-bf7b-f8e3f9ea0a90)

    By W. P. Diamond, S. L. Cario, F. Garcia, J. D. Byars, T. P. Mucho

    The National Institute for Occupational Safety and Health (NIOSH) has been conducting research at a Pittsburgh Coalbed longwall mine to evaluate and optimize bleeder ventilation and gob gas venthole l

    Jan 1, 2000

  • SME
    Stage Optimization And Production Scheduling In Open Pit Mining

    An open pit production planning method for stage mining is presented in this paper. The method brings solutions to the four most important parameters in stage mining : 1) the number of stages, 2) the

    Jan 1, 1996