Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Study on In-Situ Measurement and Evaluation of Diesel Particulate MatterBy Bok-youn Kim
Presently, mobile diesel equipments contributes a lot in improving the economical feasibility of underground mining and tunneling operations. Even in Korea, quite a large number of diesel equipments i
Jan 1, 1997
-
Effect of surfactants on calcium sulfate crystallization in phosphoric acid solutionsBy S. D. F. Rocha
The influence of surfactants on the crystallization of calcium sulfate was investigated in both hatch and continuous systems. The investigation was per formed at the following conditions. 343 °K, 28%
Jan 1, 1996
-
Extraction of Lead, Zinc and Silver from River Bed Tailings BY FeCl3By Yeonuk Choi, Patrick R. Taylor, Lyle Cunningham
Laboratory experiments have been performed to evaluate the potential for metal removal and recovery from river bed tailings by ferric chloride leaching. The lead, zinc, silver and other metals in the
Jan 1, 1992
-
Electrochemical Characterization of a Semiconductor ZnS Concentrate During Oxidative LeachingBy Wan-Kyu Choi, Arpad E. Torma
The electrochemical reactions involved in a zinc sulfide flotation concentrate leaching with sulfuric acid in presence and absence of Thiobacillus ferrooxidans, as well as with ferric chloride - hydro
Jan 1, 1990
-
Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes
Jan 12, 1986
-
Effects of Cover Depth on Ground Movements Induced by Shallow TunnellingBy Johan Bosch, Wout Broere, Minh Ngan Vu
"INTRODUCTION Shield tunnelling is often used in constructing underground infrastructure in cities due to the ability to limit settlements and damage to existing buildings. However, in an urban enviro
Jan 1, 2016
-
SO2 abatement in a 440-kW pilot-scale combustor - limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
INTRODUCTION Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler lime
Jan 1, 1987
-
An Update on the Performance of the Tankcell E500 at the Kevitsa Mine"Outotec’s TankCell® e500 flotation cell was commissioned during 2014 at the Kevitsa Mine in northern Finland. The TankCell® e500 is the first cell in this size class (500m3) to be run in an operation
Jan 1, 2016
-
Health Effect Coefficients For Radium And Radon Released In The Mining And Milling Of UraniumBy V. C. Rogers, K. K. Nielson
INTRODUCTION An evaluation of the radiological health risks from uranium mining and milling requires the determination of several key parameters. As shown in Figure 1, the first step is the estimat
Jan 1, 1981
-
Bond Gold Colosseum Inc. Crushing And Grinding: An UpdateBy R. L. Beatty
The Bond International Gold (BIG) Colosseum Gold Mine was discovered in 1865, but no recorded production occurred until the 1930's, with production approximately 19k9 (615 oz) of gold. The mine w
Jan 1, 1989
-
Physical coal cleaning to reduce Illinois NO. 6 seam coal's slagging potentialBy C. D. Harrison, J. W. Parkinson
This paper compares the ash slagging potential of Illinois No. 6 seam coal as raw coal, as commercially cleaned coal processed in a baum-jig plant, and as coal cleaned to a reduced ash specification a
Jan 1, 1987
-
Modeling Of So2/Air Cyanide Destruction ProcessBy H. K. Lin, J. L. Oleson
The purpose of this study is to develop a mathematical model to describe the oxidation of cyanide with SO2as proposed in the Inco process. This research employed a direct method for measuring the chan
Jan 1, 2004
-
Thermochemistry Of The Fe, Ni And Co-NH3-H2O Systems As They Relate To The Caron Process: A ReviewBy E. Asselin
Passivation of Fe-Ni-Co alloys during the Caron leach process is thought to result in low cobalt recoveries in ammoniacal ammonium carbonate solutions. A brief review of the available thermochemical
Jan 1, 2011
-
Thermochemistry Of The Fe, Ni And Co-NH3-H2O Systems As They Relate To The Caron Process: A Review (b124d2d6-d80c-4f42-bceb-b0ea6ac6b779)By E. Asselin
Passivation of Fe-Ni-Co alloys during the Caron leach process is thought to result in low cobalt recoveries in ammoniacal ammonium carbonate solutions. A brief review of the available thermochemical d
Nov 1, 2011
-
Survey Of Electromagnetic Emissions In Underground Coal Mines - SME Annual Meeting 2022By N. Damiano, C. Zhou, R. Jacksha, J. Srednicki
Modern electronic devices and systems used to enhance miner safety and health are becoming commonplace in underground coal mines. The ability for these devices and systems to function properly in the
Mar 2, 2022
-
Ventilation Requirements In Large Underground Openings At Mines GaspéBy Gilbert Sauriol
The mining complex, which the Mines Gaspé division of Noranda Mines Limited has operated in Murdochville since 1954, includes open pit and underground mines, two mills, one leaching plant and a smelte
Jan 1, 1983
-
Control Of Flotation Recovery Using Regression Analysis ? IntroductionBy Adrian C. Dorenfeld
The concentrator of Bonneville Ltd.* at Wendover, Utah, processes a feed obtained by, solar evaporation of a brine containing sodium and potassium chlorides with minor amounts of impurities. Salable p
Jan 1, 1965
-
Empirical Correlation To Determine Laboratory Mill Grinding TimeBy V. M. Torres
An empirical correlation to detennine laboratory mill grinding time has been developed. Grinding samples to 90 ± 5# below 147 micrometers was required for a flotation testwork at Companhia Vale do Rio
Jan 1, 1996
-
Polymer configuration and its importance during the flocculation sequenceBy B. J. Scheiner, D. A. Stanly, P. M. Brown
The Bureau of Mines has developed an equation that describes the dewatering of clay slurries with poly- ethylene oxide. This dewatering equation is: A[ ] = KC + b where n, k, and h are empirica
Jan 1, 1991
-
Optimum Cement Quarry Scheduling AlgorithmBy Kadri Dagdelen, M. Waqar Asad
Cement production involves the processing of raw materials that contain - Si02, A1203, Fe203, CaO, MgO, LOI (loss of ignition), S03, K20, Na2O, Ti02, P2055 and Cl- to produce the synthetic mineral mix
Jan 1, 2002