Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Industrial Minerals 2005 – Common Clay and ShaleBy R. L. Virta
Common clay is a natural, fine-grained material composed of hydrous aluminum silicates. Shale is a laminated sedimentary rock that is formed by the consolidation of clay, mud or silt. Production
Jan 1, 2006
-
Underground Mining At Jin Chuan Nickel-Copper Mines, China ? IntroductionBy J-Y Chen
China was once deficient in nickel and almost totally reliant on imports for its domestic needs, supplies mainly coming from Canada since the ending of imports from the U.S.S.R. in early 1960's.
Jan 1, 1987
-
A Scientific Exploration of Blast‑Induced Ground Vibration Mitigation Strategies for Sustainable Coal Mining in India - Mining, Metallurgy & Exploration (2024)By NARAYAN K. BHAGAT, ARVIND K. MISHRA, C. Sawmliana, Rakesh Kumar Singh, Panchanan Hembram
Mining operations in close proximity to dwellings and sensitive structures present challenges in terms of mitigating the undesirable effects of blasting while maintaining productivity and ensuring the
Jan 23, 2024
-
Studies On Water-Injection Cyclone For Processing Iron Ore FinesBy U. B. Kodukula
Attempts are made to evaluate the feasibility of using a water-injection cyclone for the concentration of iron ore fines. The separation characteristics of clay fines, containing large amounts of alum
Jan 1, 2008
-
Fire Size and Response Time Predictions in Underground Coal Mines Using Neural NetworksBy Brian Y. Lattimer, Kray D. Luxbacher, Jonathan L. Hodges, Manuel J. Barros-Daza
The abstract discusses the importance of predicting fire response time (the time before conditions become untenable for firefighters) in underground coal mines. It introduces a data-driven approach us
Mar 6, 2022
-
Cliffs Robe River-The Success Story Of An Australian Iron Ore ProjectBy O. R. Bell
In Australia's remote North West are located the operations of Cliffs Robe River, one of the world's largest iron ore projects. Initial project cost was $US300 million and required the const
Jan 1, 1979
-
Modification Of Limestone-Based Material For Increased Efficiency Of Arsenic Removal From WaterBy A. D. Davis
Limestone-based material shows great promise for removal of arsenic from water. In laboratory tests, it has removed more than 95% or arsenic and more than 99% of cadmium and lead. In addition, the w
Jan 1, 2012
-
Minnesota Iron Mining Industry Looks at ChangeBy William R. Yernberg
The combined 76th Annual Minnesota Section of SME meeting and 64th Annual University of Minnesota Mining Symposium were held April 8and 9, 2003, in Duluth, MN. This year’s theme was “Stakeholders, Par
Jan 1, 2003
-
Insights into practical decisions surrounding hydraulic fracturing trials from numerical modeling - RASIM2022By Ulf B. Andersson, Christina Dahnér-Lindkvist, Bruno Figueiredo, Jessa Vatcher, Jonny Sjöberg, Joel Andersson
Hydraulic fracturing to precondition the rock mass in high seismic risk environments has great potential. Unfortunately, there are many unanswered questions about how to best implement a hydraulic fra
Apr 26, 2022
-
An Auxiliary Cross-Pit Mining System For Selective Removal And Replacement Of Soil And OverburdenBy David A. Fawcett
An auxiliary cross-pit mining system, working in tandem with the prime excavator, is evaluated technically, operationally and economically for application in the selective removal and replacement of s
Jan 1, 1981
-
Chloride Leaching Of A Complex Matte: Comparison Of OxidantsBy H. I. Kim
The leaching of a complex matte in chlorine and chloride media was studied. The matte was prepared from manganese nodules by the reduction smelting-sulfidation route. From XRD analysis, the major phas
Jan 1, 2009
-
Decision Support System For Underground Construction - A Mining Case StudyBy Robert M. Miller, Judy Milligan
A computerized "Decision Support System" was used to evaluate an "Underground Platform Approach to Oil Recovery". Over a billion calculations were required to model the mine layouts; learning curves f
Jan 1, 1987
-
Slurry Shield Method In JapanBy Hisashi Takahasi, Hironobu Yamazaki
INTRODUCTION The slurry shield method was developed in Japan in 1963 and its experimental tunnelling work was performed in 1965. Although the history of this method is short compared with the conve
Jan 1, 1976
-
Development Of Mini Pilot Plant And Its Application In Milling OperationsBy D. Shink
A small scale continuous flotation cell was designed and constructed at Noranda Technology Centre to develop a mobile testing flotation circuit located next to the production circuit. This mobile smal
Jan 1, 1992
-
Orebody and Mine Planning Assessment Based on Alternative Recoverable Resource Model Techniques and OptionsBy M Aboagye, K Appau, W. Assibey-Bonsu, C. Muller
A case study based on two recoverable resource modelling techniques (indirect and direct or localised methods) have been derived using typical feasibility study or new mine drilling data configuration
Jun 25, 2023
-
Advanced underwater acoustics for unchained operations in deep sea mining - S2C-network solution for underwater communication, geo-referenced navigation / positioning and monitoring purposesBy K. G. Kebkal, R. Bannasch
"Because the operation of tethered underwater vehicles in the deep ocean or under drifting ice areas is very complicated or impossible, the application of autonomous underwater vehicles (AUV) is prefe
Sep 1, 2014
-
Evaluation Of The Altair Centrifugal Jig For Fine Particle SeparationsBy M. K. Mohanty
Due to inefficiencies of the flotation process, significant effort has been recently provided to develop gravity separators for treating ultrafine particles. As a result, several enhanced gravity conc
Jan 1, 1998
-
Cleaning Low-Quality Coal To Increase Mine Productivity And Improve Power Plant PerformanceBy Clark Harrison
It is not uncommon for overall quality of coal from a mine to deteriorate as the mine is developed or for an improved-quality coal specification to be imposed during the life of the mine. Either of th
Jan 1, 1987
-
Estimating Dewatering Rates And Designing Deep-Well Dewatering Systems For Open-Pit Mines By Use Of Numerical SimulationBy E. Scott Bair
Renewed interest in the vast reserves of anthracite coal in eastern Pennsylvania led to the use of a numerical model for simulating the hydrologic effects of constructing an open-pit anthracite mine.
Jan 1, 1980
-
Installation of the No. 4 Shaft and Hoist at the Star Mine`By W. E. Crandall
The Star-Morning mine is a. 1000-ton-per-day lead-zinc producer located in the easterly part of the Coeur d'Alene Mining District of North Idaho. The property includes both the Star and Morning m
Jan 1, 1971