Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
On the Reduction of Algorithmic Smoothing of Kriged EstimatesUtilizing a very large database from a mined-out area on a South African gold mine, the relative efficacy of a method to mitigate the smoothing effect introduced by the algorithmic constraints imposed
Jan 1, 2014
-
-
Mining through areas affected by abnormal stress conditions at Syferfonte in CollieryBy C. Legote
"This paper investigates the conditions leading to the indefinite termination of production in four critical primary panels at an underground coal mining operation, the observed shortcomings in the mi
Jan 1, 2015
-
Techno-Economic Optimization Of Level And Raise Spacing In Bushveld Complex Platinum Reef Conventional Breast MiningBy C. Musingwini
The Bushveld Complex is economically significant and strategically important to South Africa, thus it is imperative that optimal extraction of platinum group metal (PGM) resources on the Bushveld Comp
Jan 1, 2010
-
Wet Shotcrete TrialBy A. D. Storrie
An underground wet shotcrete trial was completed last year to determine the effectiveness of wet shotcrete as an alternative support mechanism to dry shotcrete in the kimberlite environment. The wet s
Jan 1, 2001
-
Case Study Of The Rockpass System At Kloof No. 3 ShaftBy R. Hart
In this paper, problems that have been experienced with the rockpass system at Kloof Mine No. 3 Shaft are described. Actions that have been taken to overcome the problems are also described. These inc
Jan 1, 2006
-
Estimating the modulus of elasticity of the rock material from compressive strength and unit weight - SynopsisBy I. Ocak
The modulus of elasticity of rock material (Ei) is an important rock property that is used as an input parameter in the design stage of engineering projects such as dam and tunnel constructions, minin
Jan 1, 2008
-
Characterization Of Au Catalysts - SynopsisBy T. van Heerden
A range of supported gold catalysts was prepared by ion exchange, varying many of the preparation variables, including concentration in the precursor solution, washing procedure, as well as drying and
Jan 1, 2012
-
The Treatment Of Acid Effluent From The Grootvlei Mine Using Novel IX TechniquesBy R. E. Robinson
A novel variation of the GYPCIX process for the treatment of the acid mine effluent water from Grootvlei is described, in which a number of valuable by products can be obtained and the product water c
Jan 1, 1998
-
2D DEM Verification: Load Behaviour And Forces On A Lifter BarBy M. A. van Nierop
The Discrete Element Method (DEM) is a model that is used to simulate the motion of the media in a grinding mill. The sum of the energy that is lost in inter-media and media-wall collisions represents
Jan 1, 1999
-
Environmental Risk Assessment As The Basis For Mine Closure At Iscor MiningBy S. J. Swart
This paper discusses the principles and application of risk assessment and management as the basis for environmental management within the mining industry. Unlike in other industries, mines are requir
Jan 1, 1998
-
Occupational Health And Safety Risks Associated With Sulphur DioxideBy C. J. Badenhorst
Oxides of sulphur are corrosive and are produced when sulphur-containing fuels are burned. Sulphur dioxide (SO2) is a colourless gas with a characteristic, irritating, pungent odour. Exposure routes t
Jan 1, 2007
-
Ultra-Deep Level Mining ? Future RequirementsBy D. H. Diering
The paper deals with the technologies required for opening up anew idealized ultra-deep level mine. First the overall philosophy of accessing ore at ultra depths is discussed. Then the individual tech
Jan 1, 1997
-
Labour?s Utilization And Labour?s Productivity Of A Gold Mine In Saudi ArabiaBy M. S. M. Aljuhani
In this paper, one of the human factors that affect productivity in an underground gold mine in Saudi Arabia was investigated and analysed for the purpose of improving productivity. The human factor t
Jan 1, 2002
-
Annual Report - For The Year Ended 30th June 2004Council for 2003/2004 President T.R. Stacey President-elect F. M. G. Egerton Vice-presidents Senior W. H. van Niekerk Junior R.P.H. Willis Immediate Past-president S.J. Ramokgo
Jan 1, 2004
-
Annual Report - For The Year Ended 30th June, 2002Council for 2001/2002 President A.A.B. Douglas President-elect S.J. Ramokgopa Vice-presidents Senior F.M.G. Egerton Junior Prof. T.R. Stacey Immediate Past-president Dr L.A. Cra
Jan 1, 2002
-
Practical Aspects Of The Ventilation Of High-Speed Developing Tunnels In Hot Working EnvironmentsThe excavation of ramps and tunnels often requires high-speed development with (or without) the use of high-energy mining equipment such as loaders, dump trucks, TBMs and roadheaders. This high-spee
Jan 1, 2000
-
Comment On The Paper: Design Of Merensky Reef Crush PillarBy F. S. A. de Frey
The author would like to refer to his contribution to the paper `Design of pillar systems in South Africa' by Ozbay et al. 1. The authors agreed `wholeheartedly that further research, together w
Jan 1, 2011
-
Survey And Geotechnical Slope Monitoring ConsiderationsBy F. T. Cawood
Monitoring of the slopes of surface mines can prevent loss of life, loss of equipment, loss of production and possibly the loss of the mine. The effectiveness of such monitoring depends on the extent
Jan 1, 2006
-
Lessons Learnt From Heap Leaching Operations In South America - An UpdateBy B. Ulrich
The basis of this paper is a compilation of work in the design and construction of copper heap leach facilities, and interviews with various heap leach operations personnel in Chile and Peru. The purp
Jan 1, 2003