Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Ontario Hydra T.G.S. Chimney Demolition Thunder Bay, Ontario, Canada

    By Ray Jambakhsh, Gabrielle Bourget

    In the summer of 1998, Ontario Hydro awarded a contract to demolish an obsolete and inefficient chimney by blasting. The Ontario Hydro Thunder Bay Thermal Generating Station (T.G.S.), is a fully opera

    Jan 1, 2000

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • ISEE
    Blasting in The New Millennium - Misfires The Basics Never Change

    By Steve Dillingham

    Whenever misfired holes or portions of misfired holes remain after a blast is fired, a hazardous situation exists until the unfired explosive materials have been disposed of properly. Yet, there are s

    Jan 1, 2004

  • ISEE
    The Influence of Geology on Blasthole Deviation (0b527217-6b23-477f-8c0b-03e530d5c921)

    Blasthole deviation is a frequent, well documented and undesirable occurrence in mining operations. It is caused by the drill string mechanics, operating variables and the interaction between the dril

    Jan 1, 1996

  • ISEE
    2000 Blasting in The New Millennium - A Wake-Up Call for Blasters

    By Ann Barron

    Commercial drivers have new guidelines regarding how long they can stay on the road without taking a break. Transportation officials say the new Hours of Service rule that took effect January 4th will

    Jan 1, 2004

  • ISEE
    Application of Machine Learning in rock mass characterization for Blasting

    By Javier Illanes, Felipe Moroni

    In recent years, implementation of Artificial Intelligence and Machine Learning model technology has gained ground in almost every aspect of human activities. The mining industry has not been foreign

    Jan 21, 2025

  • ISEE
    2000 Blasting in the New Millennium Tipping the Scales of Justice

    By Ann Barron, Mark Abernethy

    Along with the immense benefit of modern explosives seismic and acoustic effects caused by their detonation can be disruptive and alarming to many people. Claims range from affecting sexual performanc

    Jan 1, 2004

  • ISEE
    Ore Waste and Dilution Studies of Surface Mineral Blasting with 3D Distinct Element Heave Models

    By Stewart A. Silling, Dale S. Preece

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Modeling the movement of full scale blasting is no

    Jan 1, 2016

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • ISEE
    The Influence of Rock Mass Characteristics Onoverbreakcontrol

    By S. Paul Singh

    Rock is a heterogeneous medium, a fact often ignored during blast design. In reality, the rock mass characteristics have a controlling influence on the outcome of a blast. If the optimum blasting resu

    Jan 1, 2000

  • ISEE
    Strain-based Instrumentation for Marine Terminal Rock Blasting

    By Cathy Aimone-Martin, Brent Meins

    A comprehensive instrumentation program was implemented at the Howland Hook Marine Terminal on Staten Island, NY during proximate underwater rock blasting in 2014. Forty-two blasts took place over a 4

    Jan 1, 2016

  • ISEE
    "Sanfo": The "Missing Link" in Explosives Technology

    By R J. Johnson

    The development of "SANFO" has provided the Mining Industry with a LOW COST HIGH GAS VOLUME, VARIABLE DENSITY, Blasting Agent which can be blended "On Site" in a simple Agitator mixing and charging sy

    Jan 1, 1996

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • ISEE
    Austin's New Delay Primper Relay

    By Roger N. Prescott

    This report presents a new process in delay blasting with the use of ANFO and slurry explosives.

    Jan 1, 1977

  • ISEE
    Journal: 100 Years / SCIENTIFIC AMERICAN New York November 24, 1906 / BLASTING OUT A REEF IN NEW YORK HARBOR.

    By Robert Hopler

    Some few years ago, when the cruiser “Brooklyn” was passing through the fairway to the southwest of the Battery, the ship being fully equipped with stores, etc., and therefore at her maximum draft, sh

    Jan 1, 2007

  • ISEE
    Survival Guide For The Blaster in the 1990's

    By John W. Brown

    During the summer of 1994 the mining industry experienced numerous accidents involving blasting related incidents. The Tri-State Chapter of Explosives Engineers planned a meeting to discuss three of t

    Jan 1, 1995

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Wave Analysis and Determination of Interference Times to Minimize the Impact of Vibrations

    By Carlos Pañura, Michael Geldres, Alejandro Rojas

    The vibration waves are produced by the detonation of the explosive charges of each blasthole, analyzing the vibration waves produced by each blasthole, allow us to determine the optimal time between

    Feb 1, 2020

  • ISEE
    Blast Optimization from Drone Imagery

    By Markus Pötsch, Andreas Gaich

    Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective

    Feb 1, 2020

  • ISEE
    Quake, Quarry, or Quack

    By Dominic C, Gregory B. Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

    Feb 1, 2020