Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Use of Electronic detonators to control blast vibrations – a cautionary tale

    By S. Hosein, W. Birch, C. Johnson

    The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr

    Jan 1, 2024

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Vibration Analysis at Spain´s Largest Nuclear Storage Facility

    By Erica Lorenzo García, Benjamín Cebrian Romo, Antonio Morato Medina

    This paper presents the results of a preliminary study on blast-induced vibrations conducted at a Radioactive Waste Storage Facility, located in Spain. The study was undertaken as a preparatory step p

    Jan 26, 2026

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Blasting in the New Mellinnium: Safety and CredibilityA Recipe for Success

    By Steve Dillingham

    In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov

    Jan 1, 2003

  • ISEE
    Seismic Wave Frequency Filtering During Computer Modeling of Geophysical Charges

    By E. McCullough, D. Preece, M. Ortel

    The mining and oil industries employ techniques such as geologic mapping, core drilling and electromagnetic field techniques to explore for new deposits. New discoveries of major near-surface ore bodi

    Jan 1, 2013

  • ISEE
    Journal: 100 Years / Handling Explosives (Excerpts) Aetna Powder Company (126 pp) Chicago, 1913

    By Robert Hopler

    A detonator is a copper tube about a quarter of an inch in diameter and an inch and a half long, closed at one end and containing in the closed end a small charge of fulminate of mercury, which has be

    Jan 1, 2014

  • ISEE
    Implementation of a Real Time Traceability System from Mine to Plant

    By R. Ticona, J. Alarcon

    In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel

    Jan 1, 2024

  • ISEE
    Using a low-density explosive and setting proper blast patterns to prevent Sympathetic Detonation at Itabira Mine in the Quadrilátero Ferrífero region.

    By Vitor Barcelos, Eduardo Elói, Gabriella Vaz, Davi Oliveira, Leandro Silveira

    Following a routine production blast at Vale S.A.'s Itabira Mine in the Quadrilátero Ferrífero region of Minas Gerais, Brazil, nearby residents registered complaints about blast-induced vibrations. An

    Jan 21, 2025

  • ISEE
    The Use of Handidet Non-Electric Detonator Assemblies to Reduce Blast-Induced Overpressure at AECL's Underground Research Laboratory

    By D P. Proudfoot, S G. Keith, D P. Onagi

    A number of aspects of the Canadian concept for nuclear fuel waste disposal are being assessed by Atomic Energy of Canada Limited (AECL) in a series of experiments at its Underground Research Laborato

    Jan 1, 1996

  • ISEE
    Blasting in the New Mellinnium: On the Road to Professionalism

    By Steve Dillingham

    Blasting crews, explosive product drivers, drillers, blasters, supervisors, and salespeople all arrive daily at customer blast sites in vehicles of every type whether passenger cars, pickup trucks, or

    Jan 1, 2003

  • ISEE
    Gas control station for blasting process to fulfil the environmental goals set by the Chilean Ministry of Health.

    By Manuel Gutierrez, Roberto Gomez, Juan Aravena, Johan Gjoevad

    The use of explosives in mining operations is a process that involves the search for an ideal explosive for the type of geological condition of the mineral to be extracted. For the explosives present

    Jan 21, 2025

  • ISEE
    Daveytronic, Digital Detonator Testing in a Vibration Sensitive Environment

    By Douglas A. Bartley, Davey Bickford, Raphael Trousselle

    The long awaited arrival of a high accuracy detonator to reach the explosives end user will provide new opportunities the blasting community to become better equipped and able to improve upon the curr

    Jan 1, 1998

  • ISEE
    Marine Blasting on the New Panama Canal, Pacific Entrance

    By Paulo Couceiro, Manuel Lopez Cano, Carlos Rodgriguez Calvo

    Apart from its difficult execution, underwater blasting is one of the most critical operations of the blasting techniques; mainly because of the ground vibrations - normally associated with low freque

    Jan 1, 2011

  • ISEE
    Partnering in Blasthole Drilling

    By Ron Lutz

    In today’s world, production is the name of the game. We are all in business to make money. In the Quarrying and Mining industry the same holds true. The primary goal is to develop the best drilling a

    Jan 1, 2000

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    The Median Versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model (8c6eb78e-36ab-4850-9d6b-ecb1792625f3)

    By F Ouchterlony

    Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version

    Jan 1, 2016

  • ISEE
    Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania

    By W. De Graaf, C. Mkumbo

    Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilatio

    Jan 1, 2011

  • ISEE
    Strain-rate Dependence of Compressive Strength in a Granitic Rock

    By R. Ranjan

    Stanstead granite has been investigated with respect to its dynamic compressive strength and its strain-rate dependency. A standard Split-Hopkinson Pressure Bar (SHPB) apparatus has been employed to g

    Jan 1, 2010