Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And SuccessesBy John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban EnvironmentBy James E. Parkes
The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station
Jan 1, 2011
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter SewerBy Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Doyle Drive - Extreme Pile InstallationBy Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
Underpinning The Existing No. 1 Subway Line At The World Trade CenterBy Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2008
-
Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft CarrierBy Michael Quadagno
Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t
Jan 1, 2008
-
Accessing HistoryBy Richard Pizzi
Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to
Jan 1, 2011
-
Deviations From Design Impact Performance Of An Aggregate Pier Supported EmbankmentBy Jay L. Hodkinson
Replacement of an aging twin span river crossing in Vermont required a temporary bridge to accommodate traffic during construction. Soils beneath the temporary approach embankment consisted of very s
Jan 1, 2011
-
New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End BearingBy J. Osterberg
A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward
Jan 1, 1989
-
A Simple Evaluation Of Dynamic Pile TestsBy D. Kolymbas
A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r
Jan 1, 1989
-
An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic TestingBy R. T. Stain
Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of
Jan 1, 1989
-
Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite ClayBy Susheel R. Kolwalkar
A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred
Jan 1, 2008
-
Construction Of Pile Foundation For Railway ViaductsBy M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Bearing Capacity Of Piles In Soils With Time Dependent CharacteristicsBy M. J. Preim
Two case histories are presented on the evaluation of static bearing capacity of piles driven in soils that exhibit time dependent strength changes. Under consideration are a steel and a concrete pile
Jan 1, 1989
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Reanalysis Of Piles Under Static And Dynamic Lateral LoadsThe process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p
Jan 1, 1989
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West YorkshireBy J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Small Diameter Piling System Used In AustraliaBy P. J. Yttrup
Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods
Jan 1, 1989