Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • DFI
    The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment

    By James E. Parkes

    The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station

    Jan 1, 2011

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Doyle Drive - Extreme Pile Installation

    By Peter Faust

    The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha

    Jan 1, 2011

  • DFI
    Underpinning The Existing No. 1 Subway Line At The World Trade Center

    By Richard Crockford

    The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne

    Jan 1, 2008

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier

    By Michael Quadagno

    Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t

    Jan 1, 2008

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • DFI
    Deviations From Design Impact Performance Of An Aggregate Pier Supported Embankment

    By Jay L. Hodkinson

    Replacement of an aging twin span river crossing in Vermont required a temporary bridge to accommodate traffic during construction. Soils beneath the temporary approach embankment consisted of very s

    Jan 1, 2011

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • DFI
    An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic Testing

    By R. T. Stain

    Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of

    Jan 1, 1989

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Construction Of Pile Foundation For Railway Viaducts

    By M. D. Khattar

    The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc

    Jan 1, 1989

  • DFI
    Bearing Capacity Of Piles In Soils With Time Dependent Characteristics

    By M. J. Preim

    Two case histories are presented on the evaluation of static bearing capacity of piles driven in soils that exhibit time dependent strength changes. Under consideration are a steel and a concrete pile

    Jan 1, 1989

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Reanalysis Of Piles Under Static And Dynamic Lateral Loads

    The process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p

    Jan 1, 1989

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989