Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Optimizing Large Diameter Concrete Piles in Tidewater Virginia

    By Michael G. Batten, Brian D. Keaney

    ]The Virginia Department of Transportation (VDOT) and the harbors on the James River routinely use precast concrete piles founded in the Yorktown formation to support bridges and other coastal structu

    Sep 8, 2021

  • DFI
    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • DFI
    Innovative Cofferdams Used On The I-205 Columbia River Bridge

    By Robert Bittner

    The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for

    Jan 1, 2013

  • DFI
    Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement Piles

    By Lisa M. Splitter

    Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill

    Jan 1, 2009

  • DFI
    Confirmation Of Composite Ground Design Using Field Plate Tests

    By Timothy C. Siegel

    In response to a solicitation for ground improvement for the construction of a new hospital in Owensboro, Kentucky, the team of Berkel & Company Contractors and Dan Brown and Associates PC designed an

    Jan 1, 2011

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Design and Quality Control of Soil Mix Walls for Earth and Water Retaining Structures

    By Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock

    "In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to

    Jan 1, 2015

  • DFI
    Summary of Main Standards and Guidelines on Grouting Available in North America and Europe

    By R. B. King

    This document was prepared by the DFI International Grouting Committee with the intent to provide a summary of main Standards and Guidelines available for the North America and Europe grouting industr

    Jan 1, 2021

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban Areas

    By Paolo Cavalcoli, Marco Ziller

    "ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th

    Jan 1, 2014

  • DFI
    A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall

    By Jesús E. Gómez

    In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North

    Jan 1, 2011

  • DFI
  • DFI
    Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results

    By Walter I. Paniagua

    Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a

    Jan 1, 2007

  • DFI
    Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction

    By Patrick J. Hannigan

    The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio

    Jan 1, 1990

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    State Of The Art In Double Rotary Drilling - Experience Gained From Practice

    By Markus Schönit

    Double rotary drilling combines continuous flight auger drilling with a casing for producing a cast-in-place pile. When producing a pile an outer casing and an auger (hollow auger) rotating inside

    Jan 1, 2011

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
    Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United States

    By Giovanni A. Bonita

    The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct

    Jan 1, 2006