Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay WallsBy Dimitris Pachakis
In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th
Jan 1, 2011
-
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Driving and Extraction of Steel Pipe Piles in Nearshore EnvironmentBy Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez
"A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br
Jan 1, 2017
-
Driving And Extraction Of Steel Pipe Piles In Nearshore EnvironmentBy Nihal Bohra
A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre
-
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial TillBy Cassandra A. Wetzel
Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
-
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Acrylamide Grouting: Successfully Controlling Groundwater From Canada To South AmericaBy Jom Gentry
Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
-
Driven Pile Cost Comparison For Two Large Wisconsin Dot Bridge ProjectsBy Van E. Komurka
This paper presents a cost comparison of the driven pile foundations for two large Wisconsin Department of Transportation (?WisDOT?) projects in Milwaukee, Wisconsin: the Marquette Interchange South L
Jan 1, 2009
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
-
-
Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons LearntBy Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014