Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic Design

    By Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook

    500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created

    Jan 1, 2018

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    A Review of Current Mexican Design Approaches for Cast-in-Place Drilled Shafts in Granular Soils under Axial Loading

    By Enrique Ibarra, Manuel J. Mendoza

    "Abstract: This paper describes the current state-of-practice for the design of cast-in-place drilled shafts in granular soils under axial loading, addressing recent advances that take into account th

    Jan 1, 2014

  • DFI
    Hydraulic Impact Pile Hammers ? Background

    By Patrick Bermingham

    The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes

    Jan 1, 1987

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    Use of Porous Concrete in Secant Bored Pile Walls

    By Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen

    "Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to

    Jan 1, 2017

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino

    By Michael Arnold, Jonathan Delgado

    In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca

    Jan 1, 2018

  • DFI
    Diaphragm Walls And Barrettes For Top-Down Construction: A Project Report

    By Bjöm Böhle

    Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg

    Jan 1, 2006

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • DFI
    The Effects Of Changes In Effective Stress On A Base Grouted Pile In Sand

    By V. M. Troughton

    Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The

    Jan 1, 1989

  • DFI
    Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.

    By Paolo Cavalcoli, Federico Pagliacci

    "As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil

    Jan 1, 2015

  • DFI
    Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet Piles

    By K. Viking

    The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser

    Jan 1, 2000

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996