Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development and Production of X80 Hot-Rolled Thick Steel Strips in WISCO

    By C. -S. Xie, J. -H. Kong

    The microstructure and mechanical properties of X80 hot-rolled thick steel strips with a thickness of 17.5mm produced in Wuhan Iron & Steel Company (WISCO) are introduced in the paper. The steel strip

    Jan 1, 2005

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • CIM
    The Sullivan Mine and Concentrator: A Review Of Three Years' Progress

    By M. M. O?Brien

    THE SULLIVAN MINE The Sullivan mine of the Consolidated Mining and ? Smelting Company of Canada, Limited, is situated at Kimberley, B.C., nineteen miles from Cranbrook, a divisional point on the Crows

    Jan 1, 1926

  • CIM
    Latest Development in Cathode Stripping Machines

    By M. Schmidt, P. Nord, M. Larinkari

    Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode

    Jan 1, 2019

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • CIM
    Tensile Properties of Al-Si Alloys at Ambient and Elevated Temperatures

    By A. M. A. Mohamed, F. H. Samuel, S. Alkahtani

    "This article was undertaken to investigate the effect of nickel and zirconium additions on the strength of 354 aluminum cast alloy. The cast alloys were given a solutionizing treatment followed by ar

    Jan 1, 2012

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Using Gas Monitoring and Personnel/Vehicle Tracking to Maximize the Benefits of Ventilation-On-Demand in Underground Mining Operations

    By Tanveer Jahir

    With increasing energy costs and mounting government pressure to adopt low emission, green sources of energy, it has become imperative to develop long-term sustainable underground infrastructures that

    May 1, 2011

  • CIM
    Environmental and Ventilation Benefits for Underground Mining Operations Using Fuel Cell Powered Production Equipment

    By Charles Kocsis

    Over the last few years a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell powered equipment into underground mines to replaced diesel engine powered equipmen

    May 1, 2007

  • CIM
    Hardening of Low-Alloyed Gold

    By Jörg Fischer-Bühner

    Conventional 22ct Au jewellery alloys are comparably soft in the as-cast and soft-annealed state and hardening by cold-working is the only way of giving strength to the jewellery. The paper first focu

    Oct 1, 2003

  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • CIM
    Enhanced Coal and Mineral Flotation by Selective Clay Agglomeration

    By D. Tao

    The adverse effects of clay particles on coal and mineral processing processes such as gravity separation, flotation, filtration, and thickening are well known in the mining industry. In particular, t

    Jan 1, 2006

  • CIM
    The Noranda Smelter

    By W. B. Boggs

    The Noranda smelter was built by Noranda Mines, Limited, from the designs of A. E. Wheeler, consulting metallurgist, New York, for the reduction of ores and concentrates from the Horne mine, and to tr

    Jan 1, 1930

  • CIM
    Boliden Westmin Limited - Gibraltar Mine

    By Harry Siewert, Tom Milner, Jack Stickney

    "LocationThe Gibraltar mine is located in central British Columbia (NTS 93B/9W), 362 km north of Vancouver. Access is provided by 20 km of paved road from McLeese Lake, which lies 45 km north of Willi

    Jan 1, 2000

  • CIM
    Analysis of results from a PFC measurement campaign

    By P. Desclaux, A. Gosselin

    "In 1999, PFC measurements were carried out at Alcan smelters as part of a large measurement campaign led by the Canadian Aluminium Association. Side worked prebake (SWPB) and horizontal stud Söderber

    Jan 1, 2002

  • CIM
    A Hydrometallurgical Process to Produce Iron Powder from Scrap Iron

    By T. Rigg, J. N. Stone

    "The process described has been developed to utilize low-grade scrap -turnings, borings, tin cans and other types of ferrons scrap which currently has been of limited or no use in conventional steelma

    Jan 1, 1970

  • CIM
    Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, Temiscamingue

    By Louis R. Bernier

    Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn

    May 1, 2001