Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using Rock Physics for Constructing Synthetic Sonic Logs

    By I. O. Ojala

    Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu

    May 1, 2009

  • CIM
    The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1

    By Marc Legault

    The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra

    May 1, 2004

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    Investigation into Iron Ore Concentrate Moisture Issues

    By T. Holmes, D. C. Russell, G. Jolly

    "The AMEC Oakville office is involved in the design and construction of an iron ore concentrator located in Liberia. Currently, the site ships Direct Shipped Ore (DSO) to overseas customers. The DSO m

    Jan 1, 2014

  • CIM
    Rock Engineering Design and the Evolution of Eurocode 7: The Critical Six Years to 2020

    By A. Perucho, J. P. Harrison, A. Bedi, L. Alejano, L. Lamas, A. Sofianos, A. M. Ferrero, R. Migliazza, R. Olsson, J-F. Mathier

    "In 2010, the Eurocode for Geotechnical Design, EN-1997-1:2004 (CEN, 2004), informally known as Eurocode 7 or EC7, became the Reference Design Code (RDC) for geotechnical design – including rock engin

    Jan 1, 2015

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Study of Relationship between Pyrochlore Matrix Composition and Surface Chemistry Effects on Collector Adsorption

    By B. Hart, J. Marois

    "Scanning electron microscopy coupled with energy dispersive X-ray spectroscopy (SEM–EDX), and Time of flight secondary ion mass spectroscopy (TOF-SIMS)were used to analyze pyrochlore grains from Niob

    Jan 1, 2013

  • CIM
    Flotation Process Neural Data Analysis and On-Line Monitoring

    By Heikki Laurila, Sirkka-Liisa Jämsä-Jounela, Jarkko Karesvuori

    "Artificial Intelligence includes excellent tools for the control and supervision of industrial processes. Several thousand industrial applications have been reported worldwide. Recently, the designer

    Jan 1, 2000

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • CIM
    Evaluation of the Quebec Cartier Mining Pelletizing Plant Grinding Mill Efficiency as a Function of Mill Speed

    By Caroline B. Chapleau, Mélanie Proulx, Claude Bazin, Gaétan Lavoie

    "Quebec Cartier Mining operates a pelletizing plant in Port-Cartier, QC. Grinding, agglomeration and pellets induration are the three main steps in the preparation of iron oxide pellets. In 1998, foll

    Jan 1, 2000

  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    New Process of Eluting Gold from Activated Carbon

    By Tony Robles

    "A new process is disclosed for the recovery of gold and/or silver values from activated carbon wherein they are adsorbed as cyanide complexes. A unique chemistry allows the new process to use mill pr

    Jan 1, 2000

  • CIM
    Factors Affecting Overall Effectiveness of Teleoperated Loading and Haulage Equipment in Underground Metal Mines (2f68619f-48ff-478c-8ed0-965317a4b56f)

    By Jacek Paraszczak

    Application of teleoperated and automated mobile equipment in underground metal mines represents a promising avenue to overcome some of the challenges facing the industry. This paper addresses the iss

    Oct 1, 2009

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits

    By M. Drozd, M. Somppi, Z. Yamak

    "Granular activated carbon is widely used in the gold mining industry for gold extraction from aurocyanide-containing slurry. The extraction process can employ carbon as part of the gold recovery oper

    Jan 1, 2017

  • CIM
    In Pit Crushing & Conveying in hard rock applications Todays? challenges ? future?s chances

    By Andreas Oberrauner

    Content ? What is? an introduction ? Crushing technology ? Conveying in pits ? Pit-exiting strategies ? Mine Planning in IPCC ? Summary/Conclusions EHS slide ? Sandvik?s objective is zero harm

    Aug 1, 2013