Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport Pipelines

    By D. Wolfe, K. Reid, T. Nunn

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug

    Jan 1, 2014

  • CIM
    Activated Carbon’s Use in Gold Adsorption and Recovery (Presented with Consideration to the Operator’s Point-of-View) Scotia International of Nevada, Inc

    By Michael Drozd

    "The operation of an activated charcoal system has five separate unit operations. These unit operations have common points for CIP, CIL and CIS system, which vary widely in application.The unit operat

    Jan 1, 2008

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Simulation of Closed Circuit Mineral Processing Operations Using Limn® ?Flowsheet Processing Software.

    By Donald Leroux, Colin Hardie

    "New or improved mathematical models of mineral processing machines are published almost on a monthly basis. Often, these models can be calibrated from bench-scale test results and programmed using sp

    Jan 1, 2003

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Applying Simulated Annealing to Practical Mining Phase Design

    By Meimei Zhang

    In the overall open pit mine planning process, mining phase design is a strategic driver in guiding and constructing the block extraction sequence and determining the annual net cash flow distribution

    Oct 1, 2009

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Flotation Improvements at Placer Dome's Campbell Mine

    By J. A. Folinsbee, Andre Robitaille, Tony Y. Chong

    "Conventional crushing and grinding is followed by gravity concentration to recover free milling gold. Refractory gold, finely disseminated within the pyrite and arsenopyrite matrix, is recovered by f

    Jan 1, 1998

  • CIM
    A coal processing characteristics index

    By N. Wang, A. I. A. Salama

    "An index to evaluate the amenability for processing of different coals is implemented. The index is based on the well-known Mayer-curve or M-curve. The index is superior to other existing indices and

    Jan 1, 2001

  • CIM
    Explosions in Mines ? Systematic Failure

    In some parts of the world explosions in mines are more commonplace events. Even in the more developed nations explosions have occurred in recent times. In some cases these mines have significantly lo

    Aug 1, 2013

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • CIM
    Mineral Process Plant Monitoring at Greens Creek: By Looking at the Minerals Themselves

    By R. Haecker, S. Bajic, R. Thorpe, A. Palko, M. Kalstrom

    "Historically, mineral processors have used inferential data like plant instrumentation, assays, and grind sizes to monitor the performance of their plants. The ability to monitor the minerals themsel

    Jan 1, 2014

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan

    "Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market

    Jan 1, 2005

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Simulation of an Iron Ore Concentration Circuit Using Mineral Size Recovery Curves of Industrial Spirals

    By Pierre Roy, Claude Gosselin, Maryam Sadeghi, Michel Bourassa, Christian Rochefort, Claude Bazin, Gautier Mahieu, François Lavoie, Marilène Renaud, David Cataford

    "Spirals are gravity concentrators used for the concentration of iron oxide minerals from ores. This paper presents the mineral size recovery curves observed for spirals operating in two Canadian iron

    Jan 1, 2014

  • CIM
    A Review of Gas Dispersion Studies in Flotation Plants

    By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie

    "Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th

    Jan 1, 2015