Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • CIM
    A study of copper smelting reverberatory furnace design and performance and methods available for increasing throughput

    By M. A. T. Cocquerel, M. G. Burcher, J. G. Eacott

    "This paper is based on work carried out to examine the feasibility of increasing the smelting rate of two oil-fired calcine-charged reverberatory furnaces . Various constraints prevented physical enl

    Jan 1, 1980

  • CIM
    A general purpose computer program for data analysis in exploration

    By W. R. Green, B. W. Barde

    "Geological exploration involves the collection and analysis of a wide variety of information. A basic problem in interpretation is to determine the interrelationship s of the different data. A number

    Jan 1, 1984

  • CIM
    The recovery and utilization of fine coal

    By W. L. Thayer, K. A. Jonasson, R. D. Coleman, J. D. Hazlett, C. E. Capes

    "Loss of coal fines in reject slurries limits the yield of coal cleaning operations. Difficulties in handling fines also limit the extent of physical cleaning in treating coals with finely-disseminate

    Jan 1, 1988

  • CIM
    Continuous loading and conveying technology in mining

    By Dale Lens, W. S. (Wayne) Cusitar

    "The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a

    Jan 1, 1987

  • CIM
    All-Hydraulic Bucket-Wheel Excavators (A Synopsis)

    By Walter Durst

    On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at

    Jan 1, 1979

  • CIM
    Controlled blasting to minimize overbreak with big boreholes underground

    By P. R. Day, W. K. Webster

    "The introduction of large boreholes underground initially involved taking the techniques of open-pit bench blasting to the production stope, but with deeper boreholes and narrower stopes more control

    Jan 1, 1982

  • CIM
    Applying tracer gas techniques to evaluate the air distribution in flood leaching stopes

    By A. Sheikh, S. Hardcastle

    "Various methods of leaching are being used by Denison Mines Ltd. Uranium Operations. This study was designed to investigate the flood leaching operation of two parallel inter-connected stopes contain

    Jan 1, 1988

  • CIM
    Application of kinetics and liberation data to analysis of an industrial flotation process

    By N. W. Johnson

    "Two analysis tools which have been applied to problems in industrial flotation processes are the application of kinetics and detailed mineralogical or liberation data, both on a size-by-size basis. T

    Jan 1, 1987

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988

  • CIM
    Prospects for the Canadian uranium industry

    By O. J. C. Runnalls

    "Canada became the world's largest uranium producer in 1984. That leadership position is likely to be maintained for many years into the future because of a firm production base, many undeveloped

    Jan 1, 1988

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • CIM
    The identification of mineralized granitoid plutons from ore-element distribution patterns in regional lake sediment geochemical data

    By P. H. Davenport

    "The ore-element patterns in regional lake sediment geochemical survey data from four areas of Newfoundland containing granite-related mineralization reveal characteristics which can be used to identi

    Jan 1, 1982

  • CIM
    Mining of the Ming Orebody by the Consolidated Rambler Mines Limited

    By H. Sahay

    This paper summarizes the history and ore-grade statistics of mining the Ming orebody, and then details the mining methods. Included are raising, stoping, drilling and blasting techniques. Particular

    Jan 1, 1979

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    The use of near surface materials in gold exploration Kirkland Lake area, Ontario

    By V. N. Rampton, C. F. Gleeson

    "Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w

    Jan 1, 1987

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • CIM
    Selection of rock depressants based on laboratory kinetic studies

    By Gordon E. Agar, Brian Lyons, Gregory H. Styles, William B. Kipkie

    "Rock rejection during the flotation of a copper-nickel ore was improved by adding carboxymethyl cellulose to both a rougher and cleaner flotation stage. The selection of the rock depressant was based

    Jan 1, 1987

  • CIM
    Rail wear assessment techniques at FAST

    By Richard P. Reiff

    "The Facility for Accelerated Service Testing (FAST) program has been involved in numerous rail wear tests since its inception in 1976. A number of specialized tools have been developed to aid in asse

    Jan 1, 1988