Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Petrology and alteration of the Siscoe Stock at the Siscoe Gold Mine, Val D'or, Quebec

    By Laszlo Imreh, Pierre Trudel, André C. Tessier

    "The Siscoe gold mine is ranked as the fourth largest mine in the history of the Val d' Or mining district with a total production of 27.4 tAufrom1929 to 1949. Most of the gold mineralization occurred

    Jan 1, 1990

  • CIM
    Medium voltage switchgear and circuit breaker life extension

    By K. J. Boser

    "Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi

    Jan 1, 1998

  • CIM
    Mine Ventilation on Demand System at Nickel Rim South Mine; Testing Procedures, System Maintenance, and Results

    By E. McLaren, J. Sanftenberg, C. Cameron, H. Dello Sbarba

    "A Ventilation on Demand (VOD) system has been optimized and maintained at Glencore’s Nickel Rim South Mine (NRS) in Sudbury, Ontario, Canada for the past seven years. The system monitors and controls

    Jan 1, 2019

  • CIM
    Geologic, Geochemical, and Geochronological Constraints on the Genesis of Gold Mineralization at Poplar Mountain, Western New Brunswick, Canada

    By G. Chi, W. J. Davis, S. Watters, D. Hoy, S. Castonguay

    "The Poplar Mountain gold occurrence in western New Brunswick is hosted in the Poplar Mountain volcanic complex (PMVC), which is located along the southern segment of the regional Woodstock fault zone

    Jan 1, 2008

  • CIM
    Extraction of Nickel From Acidic Leach Solutions Using Electrostatic Pseudo Liquid Membrane (ESPLIM)

    By M. J. Steffens

    ESPLIM is a novel separation technique that combines the advantages of solvent extraction and electrostatic dispersion but its application in the extraction of nickel by the direct solvent extraction

    Jan 1, 2005

  • CIM
    Andacollo Hypogene Project

    By Tim Watson

    Andacollo Hypogene Project ?Overview Project description: Sulphide copper concentrator Throughput:55,000 tpd Location: Approximately 50 km from La Serena Elevation: Approximately 1,000 m ASL St

    May 1, 2010

  • CIM
    Size and Support Effects of Gold Model Catalysts

    By Shamil Shaikhutdinov

    CO adsorption on gold particles deposited on well-ordered alumina and various iron oxide films has been studied with temperature programmed desorption (TPD) and infrared reflection adsorption spectros

    Oct 1, 2003

  • CIM
    Electrochemical Formation of RE-Ni (RE= Nd, Dy, Pr) Alloys in Molten Salts

    By R. Hagiwara, S. Kobayashi, K. Yasuda, T. Nohira, K. Kondo

    To establish a process for the electrochemical recovery of rare earth elements from used magnet scraps, the electrochemical formation of RE-Ni alloys in molten NaCl-KCl-RECl3 salt at 973 K was investi

    Jan 1, 2014

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Geology and Mineralogy of the Hercynian Koudiat Aïcha Polymetallic(Zn-Pb-Cu) Massive Sulfide Deposit, Central Jebilet, Morocco

    By E. Marcoux, F. Lotfi, A. Belkabir, L. Maacha, A. C. Brown, S. Brunet

    "Koudiat Aïcha is a small Zn-Pb-Cu deposit, enclosed in the Visean Sarhlef volcano-sedimentary series of the Moroccan Hercynian Jebilet massif. Base metal mineralization is located between a basal uni

    Jan 1, 2008

  • CIM
    Computer simulation of grade distributions in iron ore deposits: a tool for grade control planning

    By Pierre Antoine Dhaiti, Gilbert Sergerie, Michel Dagbert, Jean-Maurice Brodeur

    "Quality of iron ore is generally determined by several factors which can be correlated or independent. Among these f actors, we generally find per cent iron, silica, magnetite or hardness. Forecastin

    Jan 1, 1983

  • CIM
    Sedimentation characteristics of Cu-Ni mill tailings and thickener size estimation

    By T. Yalcin

    "This paper describes a study carried out to determine the behaviour of Cu-Ni mill tailings during natural and flocculated sedimentations. Settling rates were examined under various conditions through

    Jan 1, 1988

  • CIM
    Advanced dielectric ceramics applied in hydrogen generation systems

    By R. A. L. Drew, G. Mendoza-Suarez, J. Filipi, R. Vintila, J. A. Kozinski

    Economics and environmental considerations along with the increasing demand of hydrogen encourage development of novel technologies such as plasma processing of hydrocarbons and thermal cracking of na

    Jan 1, 2004

  • CIM
    Experimental and numerical investigations of fluid flow in a hydrocyclone without an air core

    By J. R. Kadambi, E. Kucukal, J. Furlan

    "Hydrocyclones are used in various industrial applications, including mineral processing and tailings management, to separate or classify solid particles and/or liquid droplets from multiphase feed. T

    Jan 1, 2017

  • CIM
    Power factor regulation and peak load regulation

    By Jean-Luc Beaudoin

    "In addition to the actual energy consumed, billing is dependent on the peak load and the power factor. The lower the power factor goes, the higher will be the penalty the consumer pays. The principle

    Jan 1, 1982

  • CIM
    The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and Optimization

    By Mark Sherman, M. Dennis, Raj Rajamani

    "The two Alumbrera 36ft (10.97m)dia. SAG mills were sized, using the FDW ""Grindpower 'I program, to treat an average of 1852 tph each. This paper describes how modelling of the shell lifter design, u

    Jan 1, 1999

  • CIM
    Evaluation of Agitated Milling at Heath Steel Mines

    By J. Wild, M. Ounpuu, G. Chevalier

    "The requirements for a finer grind at Heath Steele have resulted in the investigation of agitated milling as a cost effective alternative to conventional tumbling ball mills.The grinding unit is a ve

    Jan 1, 1993

  • CIM
    Autogenous and Semiautogenous Mills 2010 Update (c8ce50b9-7ed1-4029-b5bf-b13ac92a9d7b)

    By Jr. Jones

    This paper is derived from a document that compiles autogenous and semi-autogenous mill installations worldwide, through the end of 2010. Updates have been solicited from all major mill manufacturers

    Jan 1, 2012

  • CIM
    Recovery of Fine Gold Particles Using a Falcon 'B' Separator

    By S. Gregory

    Many gold treatment plants have sulphides and coarse particle gangue components that contain gold in their tailings (cyanide leach residues and flotation tailings). Coarse and very fine liberated gold

    Jan 1, 2005

  • CIM
    Zircon-Rich Ta-Nb-REE Mineralization in the McKeel Lake Pegmatite-Aplite System, Welsford Intrusion, Southwestern New Brunswick

    By J. Keith Seidler, David R. Lentz, Douglas C. Hall, Nicholas Susak

    Abstract - The Ta-Nb-Zr-REE-rich McKeel Lake alkali granite pegmatite-aplite dike swarm is hosted within the late Silurian multiphase alkali granite intrusion (Welsford) near Browns Flats in southwest

    Jan 1, 2005