Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit MineBy N Johansson, D Johansson, A Beyglou, H Schunnesson
As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto
Aug 24, 2015
-
Value in Use ù Developing an Improvement Program for SuccessBy M Gill, A Mathias
The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi
Jan 1, 2004
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse RejectCoal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr
Jan 1, 1998
-
Using a Sustainability Assessment Framework to Achieve Enhanced Legacy OutcomesBy S R. Green, G D. Corder
The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the
Jul 10, 2012
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
MMG’s Australian Operating Model – the Implementation, Successes and LearningBy R M. S Watsford, M Davis
In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening
Jun 22, 2016
-
Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case StudyThroughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c
Nov 25, 2010
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Underground Stope Drill and Blast Designs Optimisation ProgramBy C Preston, T Williams, D Roy
The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde
Aug 24, 2015
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditingBy M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
The Geology and Genesis of High-Grade Hematite Iron Ore DepositsBy J Mukhopadhyay, J Gutzmer
Most world-class high-grade (60 - 67 wt per cent Fe) hematite iron ore deposits are the product of enrichment of Precambrian iron-formations but processes responsible for enrichment are still unclear.
Jan 1, 2002
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, MalaysiaBy B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining SolutionsBy W Curlewis, D Hake, Z Cuthbert
The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int
Sep 17, 2014
-
Management of Acid Drainage in the Australian Minerals IndustryConfirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A
Jan 1, 2003
-
Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and ConstructionBy A Hughes, S G. Rosin
This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the
Sep 17, 2014
-
Design and Use of Backfill for Support in Polish Coal Mines (80b269b9-766a-4488-9ab9-f96403287b88)By J Palarski
Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of
Jan 1, 1998
-
Construction and monitoring of development access into highly stressed rock massesBy R Talebi
A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S
Mar 29, 2023