Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A geometallurgical perspective on a high-grade iron ore deposit at Kiirunavaara, northern Sweden

    By K Niiranen

    Luossavaara-Kiirunavaara AB (LKAB) operates one iron ore mine, three concentration plants and three pelletising plants in Kiruna, Sweden. The current methods of separation at the beneficiation plants

    Jul 24, 2017

  • AUSIMM
    Characterisation and Beneficiation of Low-Grade Indian Iron Ore Fines

    By P K. Banerjee, S Kumar

    Indian iron ores with less than 62 per cent Fe are currently unexploited, except for a few sectors which export them to foreign countries. It is anticipated that by 2012 the countryÆs domestic steel p

    Jan 1, 2007

  • AUSIMM
    Maximising Value Add from Collaborative Research

    The mining industry continues to faces significant challenges due to increasing resource constraints (quality of ore bodies, water, energy, human resources) and increasing license to operate requireme

    Sep 13, 2010

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    Leadership in the Minerals Sector - Challenges and Opportunities for Management of the 21st Century (70da9914-f91b-4baf-b68d-ad490f3fca58)

    The AusIMM is concerned about the longer tem sustainability of the minerals sector in Australasia. Our contention is that the sustainability of the sector is at risk if we do not: &nbsp

    Jan 1, 2006

  • AUSIMM
    Research on the Design and Processing Characteristics of 320 m3 Air-Forced Mechanical Flotation Cell

    Research on the Design and Processing Characteristics of 320 m3 Air-Forced Mechanical Flotation Cell

    Sep 13, 2010

  • AUSIMM
    More than Coal Mining

    The energy supply in the 21st century is still secured by coal. According to estimates of the International Energy Agency (IEA), coal will have the same importance as oil for the world-wide supply of

    Dec 6, 2010

  • AUSIMM
    Land Rehabilitation at Golden Cross, Eight Years After Mine Closure

    By D Crequer

    Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents

    Jan 1, 2006

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016

  • AUSIMM
    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Sep 13, 2010

  • AUSIMM
    Methods for Evaluating Explosion Resistant Ventilation Structures

    By E S. Weiss, S P. Harteis

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) has conducted full-scale explosion experiments, to evaluate the strength characteristics o

    Jan 1, 2005

  • AUSIMM
    The practical characterisation of ferrosilicon for dense medium applications

    By W Blair, J Bosman

    The measurement of ferrosilicon rheology and characterisation of the parameters that have a direct influence on medium rheology provide the basis for evaluating, comparing and selecting an appropriate

    Jul 24, 2017

  • AUSIMM
    Iron ore benefits from neutron pulsed geochemical tools

    By R A. M Maddever, P Jeanneau, V Flahaut

    Over the entire life cycle of a mine, from early resource evaluation to the blasting of benches, the collection of geochemical data is crucial for the site operator, who must routinely and intensively

    Jul 24, 2017

  • AUSIMM
    Are Tennant Creek Style Ironstone-Related Gold-Copper-Bismuth Deposits Unique? A Review of Available Data and a Comparison with Possible Analogous Deposits

    By P A Ferenczi

    The Proterozoic iron oxide related Au-Cu-Bi (Tenant Creek style') deposits at Tennant Creek can be classified as syntectonic polymetallic hydrothermal replacement type mineralisation. These dep

    Jan 1, 1994

  • AUSIMM
    Tube bundle integrity testing methodologies

    By L Forrester

    The tube bundle system is an integral part of an underground coalmine’s gas monitoring system. The maintenance of these systems is vital to ensure the quality of the data produced. Integrity testing o

    Aug 28, 2017

  • AUSIMM
    Acoustic Emission Monitoring of Froth Flotation

    Acoustic Emission Monitoring of Froth Flotation

    Sep 13, 2010

  • AUSIMM
    Water Resources in Australian Mine Pit Lakes

    By M A. Lund, C D. McCullough

    In Australia and worldwide, open cut mining has become increasingly common over the last few decades through changes in excavation technology and ore economics. However, such operations frequently lea

    Jan 1, 2009

  • AUSIMM
    A Dilution-based Stability Graph for Open Stope Design

    By F T. Suorineni, L Baird, A Papaioanou, D Hines

    The Mathews et al (1981) stability graph was developed to provide guidance in the determination of stope sizes to control dilution in bulk mining of large orebodies. Longhole and sublevel open stoping

    May 9, 2016

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011