Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Processing of Subsea Massive Sulfide Ores by Flotation – Similarity and Features with Terrestrial Ores

    By L O. Filippov, I V. Filippova

    Subsea massive sulfide deposits have particular mineralogical compositions and textural features differentiating them from onshore ore. When extracted from salty water and exposed to the air, massive

    Nov 4, 2015

  • AUSIMM
    Laboratory investigation of relationships between zeta potential and coal dust suppression efficiency

    By Z Zhao

    Coal dust is hazardous to underground coal workers and water spray is the most common and economic method for controlling coal dust. Previous studies proved that the addition of surfactants can improv

    Oct 12, 2022

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit

    The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving

    Jan 1, 1995

  • AUSIMM
    Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper Mines

    Xstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne

    Jan 1, 2007

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • AUSIMM
    Ore Selection and Sequencing

    By J E. Everett

    A block model of the orebody is used to plan a mine. The first requirement is to identify ore to be extracted, discarding waste, so as to meet target grade, generally in multiple analytes. Commonly, c

    Sep 5, 2011

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    Use of an Online Elemental Analyser to Optimise the Sinter Process at ThyssenKrupp Steel Europe, Duisburg, Germany

    By C Delwig

    ThyssenKrupp specialises in the manufacture of high-grade steel-sheet products. Its main customers include the automotive, construction, household appliance, energy and packaging industries.At its wor

    Jul 11, 2011

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st Century

    By W Roy

    When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation

    Jan 1, 2006

  • AUSIMM
    The Sullivan Concentrator ù The Last (and Best) Thirty Years

    The optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship

    Jan 1, 2005

  • AUSIMM
    Recent Advances in Geophysical Tools

    This paper reviews recent advances in geophysical tools for mineral exploration. It does not restrict comments to methods which are usually applied in the tectonically active belt surrounding the Paci

    Jan 1, 2004

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Megablasts – Enabling Technologies in BHP Billiton Iron Ore

    By B Green

    With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed

    Aug 24, 2015

  • AUSIMM
    Blasting Approaches to Increase Mine Productivity and Reduce Greenhouse Gas Emissions in Surface Coal Mining

    By T Goswami, G Brent

    In response to concerns over greenhouse gas (GHG) emissions and an imposed cost in some jurisdictions, many mining houses have committed to reductions in their GHG emissions. However, mining faces par

    Aug 24, 2015