Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Keeping the Lights On! High Risk Blasting at Boddington Gold Mine

    By D Rubery, C Croker

    The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine

    Jan 1, 2002

  • AUSIMM
    An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

    Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The

    Dec 6, 2010

  • AUSIMM
    Promoters for Soap Flotation of Phosphate Minerals

    Promoters for Soap Flotation of Phosphate Minerals

    Sep 13, 2010

  • AUSIMM
    Hot water management at PT Nusa Halmahera Minerals’ Toguraci Mine

    By J Isles, S King, A Valenza, R Lawolo, J Evert

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by a subsidiary of Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates

    Oct 16, 2017

  • AUSIMM
    WaihiÆs 2020 Vision: Part B: Where to From Here?

    For the past 3 years Waihi as a community has been actively engaged in consultation about its future with regard to the environmental, cultural, economic and social viability. This has been made possi

    Jan 1, 2006

  • AUSIMM
    The Application of Fuzzy Analytical Hierarchy Processing to Define Optimal Post Mining Land use for Pit Area to Recognise Reclamation Costs in Open Pit Mining

    Open pit mining has considerable damaging effects on the environment of the mining region. These harmful influences have to be controlled during mining operation until mine closure. Different sections

    Dec 6, 2010

  • AUSIMM
    Combined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological Composition

    Combined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological Composition

    Sep 13, 2010

  • AUSIMM
    Mine Planning Information from Photogrammetry Sources at the El Teniente Mine

    By P González, E Córdova, E Faundez

    An integrated mine system must be capable of displaying and reporting valuable information that can be used to easily understand, manage and take action on the key parameters being reported.One of the

    May 9, 2016

  • AUSIMM
    An Environmental Evaluation of the Geochemical Properties of Kaiata Mudstone and Brunner Coal Measures, Cypress and Stockton Mines, West Coast, NZ

    By D Craw, P Lindsay, B Peake

    The geochemical properties of Kaiata Mudstone and Brunner Coal Measures are evaluated in order to determine their suitability for placement at the proposed Cypress and existing Stockton mines. Correct

    Jan 1, 2004

  • AUSIMM
    Challenges in Maximising the Value from Epithermal Gold Deposits

    By P Allen, E Gleeson, D Boakye, R Chesher, S Konopa

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Not only do epithermal gold deposits provide many challenges in estimating mineral resource

    Mar 18, 2015

  • AUSIMM
    Simulation and Animation Model for the Millerton Coal Mine (New Zealand)

    A simulation and animation model was constructed for the Stockton Coal Mine. This mine is located in the north western area of the South Island of New Zealand. This model was used to study the optimum

    Dec 6, 2010

  • AUSIMM
    Andesites as Resources for Roading and Concrete Industries, North Island Of New Zealand

    Andesites are a major source of aggregate for much of the North Island of New Zealand. There are regional differences with respect to some important properties of the andesites. Some are reactive with

    Jan 1, 2005

  • AUSIMM
    Effect of Temperature on Removal of Phosphorus from Australian Goethitic Iron Ores

    By B M. Washington, R R. Lovel, G J. Sparrow, M J. Fisher-White

    "Work in CSIRO with several Australian ores has shown that?by heating a high-phosphorus goethitic iron ore and then leaching with caustic or acid, the phosphorus levels in the ore can be lowered to a

    Aug 12, 2013

  • AUSIMM
    Calcium based ternary nitrate salts for concentrating solar power applications

    By V Shrotri L Muhmood, P Gandhre

    The current work deals with the measurement of some thermophysical properties of Ca(NO3)2 based ternary nitrate molten salts as HTF (heat transfer fluid) / TES (Thermal Energy Storage) material for CS

    Jun 19, 2024

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • AUSIMM
    Liner Design for Improved SAG Mill Performance

    A review is presented of developments in mill liners to improve performance in terms of wear, impact, as well as mill grind and throughput. These developments are in response to the growth in size of

    Jan 1, 1999

  • AUSIMM
    Suitability of Leached Ash as an Alternative Landfill Cover Material

    By A Bouazza, J Kodikara

    In this study, 23 samples of leached ash (LA) were collected from an ash pond at Loy Yang Power Station and geotechnically characterised. The samples were collected at various depths and locations wit

    Jan 1, 2003

  • AUSIMM
    System Optimisation of Design and Scheduling of Open Mining Operations

    The paper presents the development of an integrated computer aided design and planning of open cast mining, with the use of object-oriented modelling and geoinformation technologies, on the example of

    Dec 6, 2010

  • AUSIMM
    Olympic Dam rock quality designation model – an integrated approach

    By M Passmore, N Poznik

    Olympic Dam is a world-class deposit and is unquestionably one of the most geologically, structurally and texturally complex orebodies in the world. As development advances into the Southern Mine Area

    Sep 20, 2017

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010