Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Safety RegulatorÆs Perspective of Risk Management

    By R Billingham

    QueenslandÆs new safety legislation for metalliferous and coal mining (Mining and Quarrying Safety and Health Act 1999 and Coal Mining Safety and Health Act 1999, together with the Regulations) came i

    Jan 1, 2002

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    A New Technique to Combat Methane Gas Hazards

    By Forrester P. I, Richardson W

    Methane in coal mines is an ever present hazard resulting in loss of lives and serious economic consequences. For effective control of methane, ventilation alone may not be totally adequate in som

    Jan 1, 1988

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • AUSIMM
    Ultra-High-Intensity Blasting - A New Paradigm in Mining

    By G F. Brent, S Hawke, M Rothery, P Dare-Bryan

    Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa

    Sep 26, 2013

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Effect of MgO concentration on phase evolution during steelmaking slag cooling process

    By H F. Yu, S Ueda, J Diao, W F. Gu, Y Sasaki, H Qin

    The main reason for the underutilisation of steelmaking slags is their instability, which is influenced by their complex phase structure. Recycling and sustainable steelmaking slag face challenges due

    Jun 19, 2024

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Selection and Planning of Fully Mobile In-pit Crusher and Conveyor Systems for Deep Open Pit Metalliferous Applications

    By M Dean, M Nehring, P Knights, M S. Kizil

    Integrated continuous mining techniques such as fully mobile in-pit crusher and conveyor (FMIPCC) systems offer inherent labour, energy and environmental benefits to deep pit metalliferous mines. Howe

    Nov 4, 2015

  • AUSIMM
    KEYNOTE: Using Metallurgical Data to Drive Continuous Improvement

    By R Dunne

    "Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi

    Oct 10, 2016

  • AUSIMM
    Structural Control of Mineralisation at the Karangahake Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland

    The Karangahake epithermal Au-Ag mine consists of two main lodes, the Maria and the Welcome/Crown hosted in Miocene andesites. Mineralisation is strongly constrained to major structures and is genetic

    Jan 1, 2003

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012