Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Milling Methods and Costs at the Mount Isa Mines, Ltd., Mount Isa, Queensland, Australia

    By Jacobsen L. K, Gross K. B

    This paper, describing milling practice at Mount Isa Mines, is one of a series covering milling methods and costs that is being published by the Bureau of Mines, United States Department of the Interi

    Jan 1, 1939

  • AUSIMM
    Geology, Mineralisation, Alteration, and Zoning of the Cu-Fb-Zn-Ag Lodes at Quiruvilca, Peru

    The Quiruvilca district, located 80 km east of Trujillo in north central Peru (Fig. 1), has produced over eight million tons of Cu-Pb- Zn-Ag ore from approximately 60 veins since 1789. "Quiruvilca

    Jan 1, 1987

  • AUSIMM
    Exclusion of Residual Water Manifestations in Mine Workings

    The interaction of man with the environment has a double character. From one side, mankind can not exist without co- nsuming the natural resources and, from the other side, we actively alter and exe

    Jan 1, 1988

  • AUSIMM
    A New Approach for Prediction of Blast Induced Coal Fragmentation

    By Thornton D, Esterle J, La Rosa D

    Control of blast fragmentation has a significant impact on coal mine profitability. Two approaches for the characterisation of coal blastability, particularly in terms of fines, are presented. Both

    Jan 1, 1998

  • AUSIMM
    Fused Salt Electrolytic Reduction of Solid Oxides and Oxide Mixtures for Green Production of Metals and Alloys

    By D J. Fray

    In this work, a fused salt electrochemical process was investigated experimentally for production of metals and alloys directly from respective solid oxides by electro-deoxidation. Direct electrochemi

    Jan 1, 2006

  • AUSIMM
    Areation Catalysts for Upgrading Reduced Ilmenite to Synthetic Rutile

    By Bailey S, Avraamides J

    Laboratory-scale experiments were conducted in a mechanically stirred aeration vessel to determine the rusting abilities of aerated water in the presence of various catalysts compared to the industr

    Jan 1, 1996

  • AUSIMM
    Continuous Casting of Steel in Australia

    In November, 1967, a four strand curved mould continuous casting machine coupled with a 50 ton basic oxygen furnace began producing billets for the rod mill and new merchant mill at the Newcastle S

    Jan 1, 1972

  • AUSIMM
    Exploration in the Gippsland, Bass and Otway Basins

    Location & Permit Status Three major Mesozoic Tertiary basins exist along the continental shelf area of southeastern Australia, known as the Bass Strait area. They are the Gippsland (east of the long

    Jan 1, 1970

  • AUSIMM
    Komatiite-Hosted Nickel Sulphide Deposits, Honeymoon Well, Western Australia

    By Woodhouse M, Drew GJ, Andrews DL

    The Honeymoon nickel sulphide deposits are located 45 km south of Wiluna in the 2.7 Ga old Agnew-Wiluna greenstone belt in the NE of the Yilgarn Craton (Figure 1). Both disseminated and massive nic

    Jan 1, 1996

  • AUSIMM
    The Discovery and Evaluation of the Vera-Nancy Deposit, North Queensland

    By Jones BH

    Discovery of the Vera-Nancy deposit in late-1995 followed 12 years of active exploration in and around the Pajingo Epithermal System, an andesite hosted veinfield covering an area of 150 square kilome

    Jan 1, 1997

  • AUSIMM
    From Databases to Visualisation - Data Transfer Standards and Data Structures for 3D Geological Modelling

    By Horowitz F. G, Lamb P

    As mining operations become larger and more complex, larger volumes of geological, geophysical, and production data must be manipulated and interpreted on a day-to-day basis. Because of the large vo

    Jan 1, 1995

  • AUSIMM
    The Negotiated Compressed Process (NCP) (An Alternative Approach to Contracting Practices)

    By Benson R. P

    Building a new tunnel to accommodate CN North America's needs or double stacked container traffic for the next 100 years represents new and unprecedented challenges. Innovative approaches to cont

    Jan 1, 1993

  • AUSIMM
    Good Data-A Requirement For A Good Reserve

    Quite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in

    Jan 1, 1979

  • AUSIMM
    Determination of the Separation Efficiency in Dense Medium Separation of Porous Materials Using Magnetic Tracers

    By Wilkinson RDB, Van Der Meer FP

    In order to overcome the statistical limitations imposed by the need to recover density tracers by hand, magnetic density tracers were developed to determine the efficiency of dense medium separat

    Jan 1, 1987

  • AUSIMM
    Optimising the Usage of Magnetite at a Modern Coal Preparation Plant

    By Hoban M, Smith CJ

    Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne

    Jan 1, 1978

  • AUSIMM
    Design of Sample Plants ù Getting it Right First Time

    The basic rule for correct design of a sample plant is that all parts of the material being sampled must have an equal probability of being collected and becoming part of the final sample for analysis

    Jan 1, 2005

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998

    By W L. Lane, T R. Yanske

    The Doe Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining

    Jan 1, 1998

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Unique Experience of Controlling Active Spontaneous Heating in the Working BG Panel Goaf at GDK 8 Incline, RG-II Area ù A Case Study

    By B Veera Reddy

    For thick seam extraction, the Blasting Gallery (BG) method is ideal for obtaining the maximum percentage of extraction at fast rates. The continued use of this mining method is threatened by strata c

    Jan 1, 2005