Dr G K WilliamsThe exercise of preparing this paper has been both enjoyable and thought provoking.In carrying out the research I have spoken and written to many people. Without exception they have been eager to help
Jan 1, 1985
-
Ore Treatment at Peko Mines N.L., Tennant CreekPeko Mines N.L. has considerable experience in the treatment of a wide range of comparatively small orebodies.Gold-silver, bismuth, and sulphide and oxide copper ores are treated under difficult geogr
Jan 1, 1969
-
Mount Isa Mines Limited Activities and Responsibilities Mechanical Engineering DepartmentThe organization of this department is as shown in the following chart:Chief Mechanical EngineerPowerGenerationWorkshopsNew ConstructionMaintenanceTransportCommunity ServicesMineMillSmelterDesign and
Jan 1, 1953
-
Development of a Treatment Method for a Low Grade Uranium DepositBy Kwok S, Haemmerle A
Treatment methods for a low grade deposit at Mt. Fitch near Rum Jungle, N.T., were investigated. Physical beneficiation of the ore, sulphuric acid leaching, carbonate leaching and various methods of
Jan 1, 1970
-
Solute Transport Studies for a Tailings Disposal SiteBy P H. Warton
It is proposed to construct a gold extraction plant at Matatoki, near Thanes. Ore to be processed at the mill will come from reopened and enlarged underground mines north of Thanes. The project has be
Jan 1, 1987
-
Commissioning the Preparation Plant at the Newlands Coal MineThe process and control technologies incorporated into the coal preparation plant at Newlands were to be used for the first time in Australia. The commissioning organisation and procedures were se
Jan 1, 1986
-
Core & Shell Pillar Recovery Stoping in Mount Isa Silver/Lead/Zinc MineMount Isa mine is the largest underground mine in Australia and is located 2,000 kilometres north-west of Brisbane. This mine has been in continuous operation since 1931 and in 1986/87 the silver/lea
Jan 1, 1990
-
Studies on the Fouling and Regeneration of C.I.P CarbonBy Hosking JW, Muir DM, Ruane M, Smith I. Hinchliffe WD
Maintaining carbon activity is critical to the satisfactory recovery of gold in the Carbon-in-Pulp (C.I.P.) process. Reduced activity can lead to gold losses in tails and lower tonnage throughput.Carb
Jan 1, 1984
-
Technology-Key to Capital Growth and its Significance as an Export CommodityDuring the post war era, the requirements of the "Third" World for modern civil works, energy and industry, coupled with an insistence that these capital installations are understood and controlled
Jan 1, 1975
-
The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq
Jan 1, 1978
-
The Use of SEM/EDS Techniques in Studies of Coal and Associated Mineral MatterThe light microscopic study of the physical structures of coal and associated mineral matter is an important technique in providing information on the characterisitics and possible behaviour of coal
Jan 1, 1989
-
1.3 Million Tonnes Blast In T33-34 Stope At Mount Isa Mines LimitedThe T33-34 blast, the first major blast at Mount Isa Mines, broke 1,360,000 tonnes of copper ore using 349 tonnes of explosives. The original concept of firing T33, T34, T35 and U37 separately was
Jan 1, 1977
-
Development in Ground Support Practices at ISA MineBy Thompson J
A programme of testing and evaluation has been in progress at Isa Mine for the last four years with the objectives of rationalising ground support practices, improving installation quality and increas
Jan 1, 1985
-
Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesBy Baafi E. Y
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res
Jan 1, 1998
-
Three Expert Systems Which Give Advice on Coal Mine Methane and Dust ControlBy King R. L
The Bureau of Mines has developed and deployed three expert systems to give advice on mining health and safety. These are: dust control for continuous miners, dust control for longwall shearers, a
Jan 1, 1988
-
Consideration for Tubular Roof Bolt Design For a Rapid Face Bolting SystemBy Schmidt LC
The method of supporting excavated roofs in underground coal mines by conventional roof bolting systems is challenged due to its shortcomings of being time-consuming and leading to possible unsafe ins
Jan 1, 1991
-
Primary Crusher Optimisation for Improved ComminutionThe first step in the mining and processing of nearly any mineral ore is comminution. Since the oil embargo of 1979, the mining companies have been striving to reduce energy consumption and costs. The
Jan 1, 2004
-
Research and Application of Total Tailings Backfill at Zhangmatun Iron MineBy Wang Xia, Zhou Aiming, Shi Shengyi
Zhangmatun Iron Mine is situated in the suburbs of Jinan city, Shandong, China. Because of surface environmental constraints, no suitable site can be selected to dispose of mill waste. The full mill t
Jan 1, 1998
-
A Rapid, Efficient and Cost-Effective Method for Assessing the Environment in Large or Remote Areas Using Remote SensingBy Anderson DR, Tassell G
A major environmental impact study carried out in the sand dunes of eastern Cape York used image analysis of remotely sensed data to both select sites for ground investigation and categorise the di
Jan 1, 1987
-
Recent Development in Ironmaking Feed PreparationBy Gadsden R. W
Physical and chemical requirements are defined for coke and ferrous materials used in modern high productivity blast furnaces operating in Australian conditions. Recent developments in the type of
Jan 1, 1976