Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Design of a sintering heat profile for accelerating oxidation of magnetite ore

    By T Takayama, M Matsumura, Y Konno

    The steel industry accounts for 14 per cent of domestic CO2 emission in Japan, and iron ore sintering process occupies approximately three per cent. While Fe content in iron ore is gradually decreasin

    Nov 8, 2021

  • AUSIMM
    Estimating Mineralogy in Bulk Samples

    By R Berry

    This paper looks at two ways to estimate the bulk mineralogy of the rocks for assay intervals. The aim is to find an efficient indicator of the most common minerals in the rock. Phase (modal) analysis

    Sep 5, 2011

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    Commissioning the Cannington Project ù Creating Success

    By C Torrisi, J Andreatidis, M Duffy

    BHPÆs Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to pro

    Jan 1, 2000

  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    Towards grade engineering using X-ray microtomography

    By K Barbosa, G Wilkie, F Reyes, V Jokovic, C Evans

    The idea behind Grade Engineering is to exploit the natural heterogeneity of an orebody (spatial, temporal) in order to divert low-value waste out of the mining value chain. Essentially, this involves

    Aug 24, 2022

  • AUSIMM
    Tunnel Procurement Process ù Management Issues and Risk Mitigation ù æGetting it Right from the Beginning - Policy, Management, Procurement, Risk Evaluation and Decision Methodologies for Optimal ResultsÆ

    By T Isaksson, J Anderson

    The procurement process for underground construction contracts, in particular those contacts involving tunnel boring machines (TBMs), is subject to many complex and inter-related variables, including

    Jan 1, 1999

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    Geopolymer Concrete for a Sustainable Future

    By S E. Wallah, D Hardjito, B V. Ran

    The manufacture of Ordinary Portland Cement (OPC) is not only energy-intensive but also releases a significant volume of carbon dioxide (CO2) to the atmosphere. In addition, OPC in concrete often caus

    Jan 1, 2004

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Geometallurgical Modelling Techniques Applicable to Prefeasibility Projects – La Colosa Case Study

    By P A. Montoya

    La Colosa is a world-class porphyry Au project located in Colombia, currently undergoing prefeasibility analysis. As part of collaboration between AngloGold Ashanti and the AMIRA P843A GeMIII Project,

    Sep 5, 2011

  • AUSIMM
    Predicting Variations in Mill Feed

    By P McCarthy

    The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction

    Aug 8, 2011

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    An Integrated Liberation-leach Model and Ore Characterisation Procedure for Gold Ores

    By T D. H McGrath, G Wardell-Johnson, E A. Oraby, W Staunton, A R. Bax, J J. Eksteen

    "Gold ores often show significant inter-domain variation with respect to the gravity recoverable gold (GRG) content and the leach behaviour of the non-GRG component. Liberation assessment is extremely

    Jun 15, 2016

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Modelling Dynamic Fracture and Flow in Jointed Rock by Blasting

    By Y Wei, H-B Mnhlhaus

    Particles are by far the easiest objects to simulate, because their dynamics is simple. Determining the motion of particles and their interaction, a wide variety of deformable structures can be constr

    Jan 1, 1999

  • AUSIMM
    Metso SmartTag - The Next Generation and Beyond

    By K J. Riihioja, E Nozawa

    SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f

    Sep 26, 2011