    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    Generating Synthetic Data for Simulation Modelling in Iron Ore

    By J E. Everett, K Jupp, T J. Howard

    Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie

    Sep 29, 2013

  • AUSIMM
    Operation of a Rapped Sieve Bend

    By Firth B. A

    The classification performance of a Dutch State Mines (DSM) Rapped Sieve Bend has been investigated in a series of experiments. Coal slurries of a nominal 0.5 mm size were classified in the separation

    Jan 1, 1983

  • AUSIMM
    Virtual Mining Enterprise

    By using knowledge-based technology to create a Virtual Mining Enterprise and integrating it with existing technical and financial computer systems, a gold mining company has been able to reduce the t

    Jan 1, 2000

  • AUSIMM
    Down-Hole XRD Analyses as a Guide to Hydrothermal Alteration in the Wharekirauponga Epithermal Gold-Silver Prospect, Hauraki Goldfield, New Zealand

    By R Soong

    The Wharekirauponga (WKP) epithermal gold-silver deposit is located about 10 km north of Waihi in the Hauraki Goldfield east of Auckland. WKP is notable for its sheeted to stockwork quartz veins hoste

    Jan 1, 2001

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • AUSIMM
    Geophysical Signatures of Andesite Volcanoes in New Zealand - Contrasts and Structural Implications

    By C A. Locke

    Geophysical signatures of the Taranaki and Tongariro volcanoes reflect similarities in their age, composition and hydrothermal histories, but also reflect differences in host rock settings and edifice

    Jan 1, 1995

  • AUSIMM
    Past and Future Parameters for Mining the Otago Alluvial Gold Deposits

    The early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o

    Jan 1, 1992

  • AUSIMM
    Mill Operators’ conferences – a 40-year retrospective and a vision for the future

    By P D. Munro

    On the occasion of the 14th Mill Operators’ Conference and marking 40 years since the first one was held in Mount Isa in 1978, it is fitting to review the history of the Conference and its development

    Aug 29, 2018

  • AUSIMM
    Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System

    By J Knoblauch, D, P J. J Strobos, C Foggo

    The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding

    Jan 1, 2006

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project Value

    By P Myers, T Elkington, S Wonday

    Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S

    May 24, 2012

  • AUSIMM
    Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!

    By R Price, B H. Miller

    "The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f

    Nov 15, 2016

  • AUSIMM
    Modelling Geometallurgical Variability - A Case Study in Managing Risk

    By S Khosrowshahi, A Weeks, W J. Shaw

    "To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th

    Sep 29, 2013

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    Improving the performance of blind uphole rises at Ernest Henry Mine – a case study

    By T Purvis, Z Liu

    Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro

    Oct 16, 2017

  • AUSIMM
    Concentrate Thickeners Feedwell Replacement

    By M Thompson

    "The Jaguar concentrator, 60 km north of Leonora, Western Australia (WA), consists of a standard closed circuit semi-autogenous grinding (SAG) and ball mill producing a float feed of approximately 60

    Oct 10, 2016

  • AUSIMM
    Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planning

    By M Ozkayhan, N Arslan

    "The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele

    Sep 20, 2017

  • AUSIMM
    The Use of Magnesium Oxide and Iron to Predict Host Units in Grade Control and Exploration at Bulong Nickel Operation

    At Bulong, the mineralised (>0.8 per cent nickel) ore exists within numerous lithologies, which can and do occur coincidently. It is very important to discriminate between the different host units for

    Jan 1, 2000