Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    An Automated System for Flyrock and Fume Monitoring of Blasts

    By C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko

    Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r

    Aug 24, 2015

  • AUSIMM
    A Comparison of Methods for Mine Tailings Sterilisation

    By E Ferrow, R Herbert, M E. Malmstr, M Fuchs

    The study of microbial sulfide oxidation and oxidation rates of tailings requires the use of sterile control samples in laboratory experiments for comparison purposes. The need for sterile tailings sa

    Jan 1, 2003

  • AUSIMM
    Some Effects of Wood, Cement, and Aluminium Sulphate on Flotation of Broken Hill Lead-Zinc Ore

    Results of flotation tests on lead-zinc ore from Broken Hill, N.S.W., confirmed that flotation at pH 9 in the presence of cement gave poorer metallurgical results than flotation at pH 7. Additions of

    Jan 1, 1974

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • AUSIMM
    The Reduction of Nickeliferous Laterites: Thermodynamic Considerations

    By Turnbull A. G

    Thermodynamic calculations based on the ideal system NiO - Fe203 - H2(g) - CO(g) - H2O(g) - CO2(g) show that it is not possible to selectively reduce nickel oxide in the presence of hematite because f

    Jan 1, 1980

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • AUSIMM
    Controlled Recirculation: Longwall Coalface Working District Climatic Prediction

    By Tuck M. A

    The increasing depth, mechanisation and distance of working areas from surface connections places an ever greater contaminant burden on ventilation airflows. Some British Coal mines are already exp

    Jan 1, 1988

  • AUSIMM
    Taxation of Mineral Mining Operations in New Zealand

    Consents Required for Overseas Persons Overseas Investment Regulations 1

    Jan 1, 1982

  • AUSIMM
    Geological and Mineralogical Observations During Exploration in the Mount Coffin Diapir Region, S.A.

    Exploration work at the southern flank of the Mt. Coffin diapir has encountered three different types of copper ores: copper carbonate, largely malachite; secondary sulphides, mainly chalcocite replac

    Jan 1, 1972

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics - A Late Cretaceous Bimodal Association, Noumea Basin, New Caledonia

    The transgressive sedimentary sequence of the Noumea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanics of shoshonitic affinities which erupted simultaneously during t

    Jan 1, 1995

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Ironmaking Melter

    By C Garlick, O Gregory, H Rogers, B I. Winters, Z C. Ye

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multihearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-li

    Jan 1, 1995

  • AUSIMM
    Wellington Gold (A Brief Review of the Gold Mining History of the Wellington District, New Zealand)

    Alluvial gold was found in the Terawhiti area, West of Wellington, in the 1850s. This led to the discovery of reef gold. Periods of minor 'gold fever', company flotations, and mining activit

    Jan 1, 1993

  • AUSIMM
    The Mechanisation and Development of the New South Wales Coal Industry Over the Last 20 Years

    The New South Wales coal industry is a highly mechanised well organised industry which has developed from an annual production of slightly less than 13 million tons in 1950 to over 33 million tons in

    Jan 1, 1971

  • AUSIMM
    Some Mineralogical and Geochemical Features of the Hauraki Gold Deposits, New Zealand

    The Tertiary gold deposits of the Hauraki area are predominantly epithermal vein types containing mineral assemblages of quartz, calcite, pyrite, sphalerite, galena, chalcopyrite, acanthite and native

    Jan 1, 1984

  • AUSIMM
    Tubular Steel Headframe for Winze Sinking at North Broken Hill Ltd., Broken Hill

    Winzes are usually sunk 9 ft. 6 in. long by 6 ft. 0 in. wide and are divided into two compartments, 4 ft. 0 in. by 5 ft. 0 in. inside the timbers. The general practice is to sink the winze to a depth

    Jan 1, 1941

  • AUSIMM
    The Karangahake Gold-Silver Deposit

    The Karangahake gold-silver deposit is located 11 km west of Waihi in the southern part of the Hauraki Goldfield. Historically it was the second largest bullion producer in the goldfield with a past p

    Jan 1, 1987

  • AUSIMM
    Advances in Optical Image Analysis and Textural Classification of Iron Ore Fines

    Advances in Optical Image Analysis and Textural Classification of Iron Ore Fines

    Sep 13, 2010

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011