    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    Statistical Plant Trials - Efficiently Combining Concentrate Grade and Metal Recovery Results

    By S Taylor, B Lumsden, G Long

    Statistical metallurgical plant trials are becoming more widespread, as a valuable tool for increasing plant profitability. Generally, a single parameter like metal recovery varies under the trial con

    Oct 29, 2012

  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management

    By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott

    Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management

    Nov 5, 2014

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    The Research on Refined Gold Bullions Surface Upgrading

    The Research on Refined Gold Bullions Surface Upgrading

    Sep 13, 2010

  • AUSIMM
    Elevated Arsenic and Antimony Levels in a South Island Mesothermal Mineralized Zone

    By D Craw, K A. Hunter

    Deposits of the metalloids arsenic and antimony occur in quartz veins of mesothermal hydrothermalsystems in the South Island as arsenopyrite (AsFeS) and stibnite (Sb2S3). Arsenopyrite and stibnite occ

    Jan 1, 2002

  • AUSIMM
    Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New Zealand

    Vein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro

    Jan 1, 2002

  • AUSIMM
    Agglomeration for Copper Heap Leaching

    Agglomeration for Copper Heap Leaching Agglomeration of ore is a method which can be used to eliminate the migration of fine grained particles throughout a leach heap. Without agglomeration, fine ore

    Sep 13, 2010

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • AUSIMM
    High Pressure Grinding Rolls Scale-Up and Experiences

    High Pressure Grinding Rolls Scale-Up and Experiences

    Sep 13, 2010

  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    The Real Costs of Mining and Mineral Processing in Australia

    By B A. Tapp

    The minerals industry in Australia is currently regarded as the country's economic saviour; the bastion of economic security. As Fitzgerald (1974) stated, 'Australia's natural endowment

    Jan 1, 1980

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • AUSIMM
    A Process for the Flotation of Chrysocolla

    A Process for the Flotation of Chrysocolla

    Sep 13, 2010

  • AUSIMM
    Measuring and Taking Notice of Orebody Variability – An Essential Ingredient for Reliable Plant Design

    By D David

    The majority of SAG and ball mill design methodologies are applied using a single design value for mill selection, such as the 80th percentile ball mill work index or SMC value. Inherent in the select

    Sep 7, 2015

  • AUSIMM
    Investigation of the Classification Operation in a Coal Pulverising Vertical Spindle Mill

    Investigation of the Classification Operation in a Coal Pulverising Vertical Spindle Mill Coal pulverisation in power plants is a major electrical energy consumer. In 2006 more than 41 per cent of wo

    Sep 13, 2010

  • AUSIMM
    A Sustainable Minerals Sector in Australia? Thoughts from a Science and Technology Perspective

    In the context of sustainable development, the Minerals Council of Australia (2010) states that 'investments in minerals projects should be financially profitable, technically appropriate, enviro

    Jun 1, 2010