Search Documents

  • AUSIMM
    TowerMill - Advantages in Wet Grinding Applications

    TowerMill - Advantages in Wet Grinding Applications The TowerMill, which has now been in existence for no less than 50 years, is one alternative to the horizontal ball mill and offers several advanta

    Sep 13, 2010

  • AIME
    Jackling Gets Saunders Medal

    By AIME AIME

    SCRIPTURE, statistics and imagination all were drawn upon by the speakers who acclaimed Daniel C. Jackling as recipient of the William Lawrence Saunders Gold Medal for 1930. The award was made at a sp

    Jan 1, 1930

  • CIM
    Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining

    By Simon D. Handelsman

    ?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo

    May 1, 2006

  • TMS
    Recovery of Nickel and Cobalt by Pyrometallurgical Process of Waste from Producing Program of Nickel Metal Hydride Batteries

    By Hui Wang

    With the great increasing use of nickel metal hydride batteries recently, the waste of this kind batteries have been paid for close consideration. For the main reason that the waste of the batteries c

    Jan 1, 2009

  • AUSIMM
    Points on Patents

    Amongst the unavoidable studies of the mining engineer who desires to reach the maximum efficiency, is the subject of patents. With the fundamental principles of the patent laws of this and other lead

    Jan 1, 1901

  • AUSIMM
    Estimation of Tin in an Ore

    THE object that the writer has mainly in view in presenting this paper is to draw the attention of those connected with the technical side of the industry to the unsatisfactory and by no means up-to-d

    Jan 1, 1912

  • NIOSH
    RI 5938 Studies Of The MnO-SiO2 Binary System - Summary

    By E. L. Singleton

    This Bureau of Mines investigation was initiated to study and establish some of the chemical and physical characteristics of the condensed Mno-Si02 system. To prevent oxidation of the manganous ion, I

    Jan 1, 1962

  • NIOSH
    OFR-15-75 The Application Of Polymers For Rock Bonding And Reinforcement Of Coal Mine Structures ? 1. Introduction

    By R. A. V. Raff

    Although falls of roof, face and rib (or side) of coal mines were the third ranking cause of disabling accidents in 1966, the accidents from these falls resulted in the most serious injuries and accou

    Jan 1, 1973

  • AUSIMM
    Reducing total project cost in the study phase using zero base design

    By J Merrells

    Fluor, together with our clients, has yielded significant reductions in the total cost of mining projects by employing a systematic and methodical process of cost reduction. This paper outlines this s

    Jul 24, 2017

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • DFI
    The Pile Foundation Of Tall Buildings In Shenzhen

    By Li Keqiang

    This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio

    Jan 1, 1991

  • DFI
    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • SME
    Two-Seam Mining Stability at OCI’s Big Island Trona Mina

    By J. F. T. Agapito

    OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and

    Jan 1, 2000

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • NIOSH
    OFR-16-77 Proceedings - The Third WVU Conference on Coal Mine Electrotechnology - August 4-6, 1976

    A compilation of papers presented at the Third WVU Conference on Coal Mine Electrotechnology in Morgantown, West Virginia, on August 4-6, 1976. Papers cover areas of electric power, electronic communi

    Jan 1, 1976

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • NIOSH
    RI 4518 Examination, Mapping, And Sampling Of Mine Shafts And Underground Workings Leadville, Lake County, Colo.

    By Jr .. Ebbley

    The investigation of mine shafts and underground workings at Leadville, Colo., was started in May 1946 and recessed in November 3, 1946. Thirty-eight shafts and connecting accessible underground worki

    Jan 1, 1949

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • AUSIMM
    The Genesis of the Iron Ores of the Middleback Range, South Australia

    The Physiographical Features of the Region The Middleback; Range proper, from the Iron Duke in the south to the Iron Prince in the north, extends in a meridional direction for 21 miles, but may well b

    Jan 1, 1949

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009