Seam Structure - An Important Criterion for Coal Pillar DesignBy Kot F. v. Unrug
In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m
Jan 1, 2005
-
Influence Of Bolts On Discontinuities And Yielding Rock - Conceptual Developments (76baa342-4034-40cb-bc1f-e7c7c132e40f)By Buddhima Indraratna
The paper highlights the conceptual developments in rock mechanics applied to quantify the effect of bolts in the stabilization of joints and yielding soft rocks.
Jan 1, 1992
-
Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal MiningBy Andre Zingano
It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove
Jan 1, 2011
-
Shear Bond Stresses Along Cable BoltsBy Hani S. Mitri
The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio
Jan 1, 1990
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving MiningBy Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
A Method For Establishing Site Specific Coal Pillar Design GuidelinesBy Winton J. Gale
Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,
Jan 1, 1992
-
Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
Case Studies Of Depillaring Under Special Strata And Mining ConditionsBy P. R. Sheorey
Four case studies of special geomining conditions from Indian coalfields are discuss- ed. These cases relate to (a) pillar extraction in two seams simultaneously under a difficult roof (Satpura I and
Jan 1, 1988
-
Design And Planning Of Lower Seam Longwall GateroadsCase study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be
Jan 1, 1995
-
Field Testing of the Fully Grouted Thrust Tensioned BoltsBy Kot Unrug
Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati
Jan 1, 2002
-
Tension-Torque Relationship For Mechanical Anchored Roof BoltsBy H. N. Maleki
Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.
Jan 1, 1984
-
Flexible Support Design For Gateroads Of Retreating Longwall PanelsBy Erdal Unal
In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y
Jan 1, 1993
-
Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected ExamplesBy Axel Preusse
To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem
Jan 1, 2000
-
Structure, Strength And Relaxation Of Interbuden For Input Into Highwall Mining Design In The Baralaba Coal Measures Of Queensland, AustraliaBy Bret E. Leisemann
The geomechanical environment in which highwall mining must operate represents a hybrid between surface and underground operations. Mine design must take into consideration the complexities associated
Jan 1, 1993
-
Cross Well Acoustic Tomography To Locate Abandoned Underground Mines And Subsidence FailureBy Linda K. Killoran
The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomographic image reconstruction software for the detection and delineation of abandoned undergr
Jan 1, 1992
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
The Impact Of Variability In Coal Strength On Mine Planning And Design - A Case HistoryBy David A. Newman
Strength and physical property testing of coal is conducted regularly by the Arch Mineral Corporation as part of reserve exploration. Pillar design and mine layout are the primary applications for the
Jan 1, 1993
-
Investigation of Subsidence Over AML: A Case StudyBy P. M. Lin
The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even
Jan 1, 1987
-
An Investigation of the Causes of Cutter Roof Failure in a Central Pennsylvania Coal Mine: A Case StudyBy John L. Hill
Cutter roof failure is a specific type of ground control problem which frequently results in massive roof failure. It is a cannon occurrence in coal mines of the Northern Appalachian Coal Sasin, causi
Jan 1, 1984
-
International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall PanelsBy J. D. Cole
In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C