Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Techniques To Increase Yield Pillar Residual Strength

    By Dennis R. Dolinar

    The U.S. Bureau of Mines has modeled yield pillars to determine the effects of reinforcement techniques on pillar performance. Model pillars with width-to-height (w/h) ratios ranging from one to four

    Jan 1, 1993

  • SME-ICGCM
    Roof Control and Roadway Support Design in the #9 Coal Seam, Wuhushan Coal Mine, China

    By Yundong Ma

    In this paper the dynamic process of rock deformation and failure in the roadways of the #9 coal seam, Wuhushan Coal Mine by was simulated using the software "Rock Failure Process Analysis System (REP

    Jan 1, 2005

  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992

  • SME-ICGCM
    The Integration Of Geology And Engineering In Ground Control And Mine Planning For A Multi-Level Underground Limestone Quarry

    By D. Newman

    An underground limestone quarry, developed in the 1940's, transitioned from a surface quarry to an underground room-and-pillar operation. The quarry expanded to a second underground level when th

    Jan 1, 2001

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)

    By Ross W. Seedsman

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume

    Jan 1, 1992

  • SME-ICGCM
    The New Two-Dimension LaModel Program

    By Olayemi Akinkugbe

    As coal production in the United States continues to increase, the availability of unexploited or virgin fields continue to diminish. As a result, mine operators are forced to mine in unfavorable or m

    Jan 1, 2004

  • SME-ICGCM
    A Model Of Shield-Strata Interaction And Its Implications For Active Shield Setting Requirements

    By Thomas M. Baraak

    This paper evaluates factors which influence longwall support and strata interaction. The longwall system is composed of an immediate and main roof structure and three supporting foundations: 1) longw

    Jan 1, 1990

  • SME-ICGCM
    Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems

    By Reha Ozel

    The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three

    Jan 1, 1990

  • SME-ICGCM
    Proposed Criteria for Assessing Subsidence Damage to Surface Structures

    By Swapan Bhattacharya

    Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste

    Jan 1, 1984

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    An Investigation into the Support Systems in South African Collieries

    By A. Wilkinson

    An investigation into the performance of support systems that are currently used in South African coal mines was conducted. Five most critical components of a support system have been identified. Thes

    Jan 1, 2005

  • SME-ICGCM
    Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M

    By Klaus Opolony

    The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p

    Jan 1, 2002

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    Mining Under Rivers In Fuxin Coal Mines

    By Liang Yin-Huai

    In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.

    Jan 1, 1990

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004