Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    Development of a Six Drilhead Roof Bolting Machine

    By Bill A. Kyslinger

    "In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design

    Jan 1, 2016

  • SME-ICGCM
    Analysis of Monitored Ground Support and Rock Mass Response in a Longwall Tailgate Entry

    By B. Tulu, D. Gearhart

    A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a

    Jan 1, 2017

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    Selection of Tunnel Support System by Using Multi Criteria Decision Making Tools

    By Kazem Orace, Navid Hosseini, Mehran Gholinejad

    "Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t

    Jan 1, 2010

  • SME-ICGCM
    Damage and Permeability Evolution Mechanisms of Coal under Unloading Condition

    By Zhengdong Liu, Kaizhong Zhang, Zhaonan Jiang, Yuanping Cheng, Biao Hu, Qingquan Liu, Ranpeng Wang

    "Major coal mining areas in eastern China have entered into the deep mining state. Gas pre-drainage, which has been successful at shallower depths, is not suitable at greater depths because of complex

    Jan 1, 2017

  • SME-ICGCM
    Roof Bolter Synthetic Mesh Handling System

    By Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange

    "Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The

    Jan 1, 2010

  • SME-ICGCM
    Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications

    By Jinhua Wang

    Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con

    Jan 1, 1996

  • SME-ICGCM
    Economic Impact of Ascending Mine?Waters in Germany

    By Axel Preusse

    Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste

    Jan 1, 2013

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    A Retrospective on LaModel (Or Dr. Heasley?s Wild Ride)

    By Keith Heasley

    This paper is a retrospective on the development, application, and enhancement of the LaModel program from a personal perspective. The narrative starts with an explanation of the objectives behind the

    Jan 1, 2011

  • SME-ICGCM
    The Ground Response Curve, Pillar Loading and Pillar Failure in Coal Mines

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The response of the surrounding rock mass to the creation of mining excavations determines the ultimate load on a pillar support system. In conditions where the ground is relatively soft and weak, th

    Jan 1, 2010

  • SME-ICGCM
    Design Concerns of Room and Pillar Retreat Panels

    By Morgan M. Sears, lhsan B. Tulu, Ted M. Klemetti

    "Why do some room and pillar retreat panels encounter abnormal conditions? What factors deserve the most consideration during the planning and execution phases of mining and what can be done to mitiga

    Jan 1, 2016

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Utilization of the OSI Underground System's Tandem Anchor to Improve the Weak Roof's Stability of Underground Openings

    By Tom Blevins, Roland Walker, Jinsheng Chen

    "The Dywidag-Systems International DSI Tandem Anchor bolt, with an improved expansion shell-washer design, can substantially reduce potential entry roof falls caused by twisted or deformed expansion s

    Jan 1, 2010

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    Think Like a Rock

    By Tom Barczak

    Early in my career, while giving a presentation on shield design for longwall mining at one of the International Conferences on Ground Control in Mining, the late Jim Scott told me that I was finally

    Jan 1, 2011

  • SME-ICGCM
    Analysis of Global and Local Stress Changes in a Longwall Gateroad

    By Esterhuizen S. Gabriel, Su W. H. Daniel, Tulu B. Ihsan, Klemetti M. Ted, Mohammed M. Khaled, Gearhart F. Dave

    "A numerical-model-based approach was recently developed for estimating the changes in both the horizontal and vertical loading conditions induced by an approaching longwall face. In this approach, a

    Jan 1, 2017