Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • SME-ICGCM
    Comparison of the Performance of Active and Passive Roof Bolts in An Illinois Basin Coal Mine

    By Anil K. Ray

    This paper discusses in situ studies conducted at an Illinois Basin room-and-pillar coal mine to evaluate the performances of three different types of bolts under similar geologic conditions. The bolt

    Jan 1, 2012

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • SME-ICGCM
    Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) Program

    In this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic

    Jan 1, 1996

  • SME-ICGCM
    Practical Strata Management, Beltana No. 1 Mine, Australia

    By Shane McDonald

    Australia produces approximately 84 million tonnes of coal per annum from 30 longwalls in New South Wales and Queensland, operating at an average depth of around 300m. Industry trends and expectations

    Jan 1, 2008

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • SME-ICGCM
    A Stability Factor for Supported Mine Entries Based on Numerical Model Analysis

    By Gabriel S. Esterhuizen

    This paper addresses the need for a method to compare the effectiveness of different support systems when designing ground support in coal mines. At present, support design methods include empirical m

    Jan 1, 2012

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    A Case Study of Longwall Roof-Supports Interaction

    By Y. H. Wang

    During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research

    Jan 1, 1986

  • SME-ICGCM
    Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength

    By Daniel W. H. Su

    The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,

    Jan 1, 1997

  • SME-ICGCM
    An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring

    By Greg Hendon

    Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t

    Jan 1, 1990

  • SME-ICGCM
    In-Situ Tests and Numerical Simulation about the Effect of Annulus Thickness on the Resin Mixture for Fully Grouted Resin Bolt

    By Andre Zingano

    The objective of this paper is to study the effect of annulus thickness on the quality of resin mixture for fully grouted resin bolt. Pullout and mixture tests were made in underground coal mines for

    Jan 1, 2008

  • SME-ICGCM
    Aspects of Chain Pillar Design in Relation to Longwall Mining

    By B Whittaker

    The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import

    Jan 1, 1987

  • SME-ICGCM
    The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design

    By Thomas M. Barczak

    The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a

    Jan 1, 1987

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    Work Practices to Manage Bump Prone Ground

    By Floyd Varley

    In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not

    Jan 1, 2008

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006