Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cryogenic Air A Potential Solution 'Io The Problem Of Respirable Mine DustBy L. K. Eigenbrod
Throughout the mining industry, pneumoconiosis is one of the most severe occupational health problems being faced. The goal of completely eliminating pneumoconiosis as an occupational health hazard wa
Jan 1, 1971
-
Improvements In Loading And Hauling Equipment And The Effect On Unit CostsBy C. S. Davis
In being asked to present this paper on the improvements in loading and hauling equipment and the effect on unit costs, Mr. Van De Water, your program chairman, stated that his reason for coming to a
Jan 1, 1959
-
Industrial Minerals 2004 – Fuller’s EarthBy R. L. Virta
Sixteen companies mined fuller’s earth in 11 states during 2004. Production during 2004, based on a preliminary survey of fuller’s earth producers, was 3.96 Mt (4.3million st) valued at $340 million.
Jan 1, 2005
-
Mineral Resource Solid Waste Stabilization And ReclamationBy K. L. Ludeke
For many reasons it appears that deep-rooted, perennial shrubs offer potential for improved stabilization and provide maintenance-free vegetative cover to harsh sites where perennial grasses have not
Jan 1, 1984
-
Reducing SO2 Emissions From Coal-Firing Utility FurnacesBy J. A. Barsin
Stationary air pollutant sources established prior to the New Source Performance Standard (NSPS) are not, at present, subject to federal emissions regulations. However, proposed legislation could requ
Jan 1, 1986
-
Optimizing Loading And Hauling Equipment Productivity In Surface MiningBy R. K. Singhal
Optimization of a load-haul system for a surface mine involves two processes. The first is proper selection of mining equipment compatible with the minesite job specifications and the second is an eff
Jan 1, 1986
-
Long‑Distance Advanced Pre‑grouting Layer Flexible Reinforcement Mechanism and Its Application in Large Mining Height Coal FaceBy Shaoyang Yan, Xinming Chen, Huazhe Jiao, Huaibao Chu, Chang Wang
In terms of the technical problems of rib spalling in large mining height coal face, a long-distance advanced pre-grouting layer flexible reinforcement technology is proposed in this paper. Based on t
Sep 27, 2022
-
A Mini Field Test Of In-Situ Uranium Leaching: Interpretation Of ResultsBy Muhammad I. Kabir
A new minitest of in situ uranium leaching processes at reservoir conditions is proposed. The test which consists of a single observation/ production well and two observation wells is designed to perm
Jan 1, 1981
-
Novel Technology Methods of Enterprise Unmanned Traffic Management (E‑UTM) Solutions for Mining (Mining, Metallurgy & Exploration)By Aimee A. Woolsey
Enterprise Unmanned Traffic Management is a holistic system concept evolving from technological developments in radio frequency where dynamic tracking can be added into current and emerging platforms.
Oct 17, 2022
-
The Good, The Bad, And The Ugly Lessons Learned In The Design And Construction Of Heap Leach PadsBy Allan J. Breitenbach
Heap leach operations provide a low-cost method for recovering gold, silver, and copper metals from low grade ore materials. The processed ore materials are stacked in controlled lifts on a lined pad
Jan 1, 1999
-
Chemical-Related Injuries And Illnesses In U.S. Mining - Preprint 09-031By D. F. Scott
The purpose of this study was to determine if miners are at risk from exposures to chemicals used in the mining industry, and determine the nature and sources of the illnesses and injuries. The autho
Jan 1, 2009
-
Highwall Stability In Open-Pit Coal Mines, Western Powder River Basin, Wyoming And MontanaBy Fitzhugh T. Lee
Results from the first part of a two-part investigation of the stability of highwalls in open-pit coal mines in the Paleocene Fort Union Formation of the western Powder River Basin of Wyoming and Mont
Jan 1, 1977
-
Ecosystem Management Permitting Review Process For The Hardee County Mine In Florida Farmland Hydro, L.P.By U. K. Custred
Who We Are Farmland Hydro (FHLP) is a Limited Partnership formed by Farmland Industries, the largest U.S. farmers’ cooperative, located in Kansas City, MO, and Norsk Hydro, a large Norwegian compan
Jan 1, 2000
-
Business Dynamics And Diversification PlanningBy F. Alsobrook
Industrial minerals are receiving increased attention by metals, coal and other companies seeking to diversify and stabilize earnings. Each industrial mineral has a unique set (and sub-sets) of busine
Jan 1, 1990
-
Improving The Plant Metallurgical BalanceBy Ronald L. Wiegel
In a mineral processing plant there are a number of routine decisions which are based at least in part on the plant's metallurgical performance. Among these are those related to: 1) equipment f
Jan 1, 1978
-
Preparation Of Short-Range Mining Plans By Computer At The Utah Mine Of Kennecott Copper Corporation ? I. IntroductionBy John Duff Erickson
Computer use has become an integral part of mine planning at Kennecott Copper Corporation?s Utah Copper Division, Bingham Canyon mine. Engineers are using the computer for development drilling calcula
Jan 1, 1966
-
Industrial Minerals 2004 – Common Clay and ShaleBy R. L. Virta
Common clay is a natural, fine-grained material composed of hydrous aluminum silicates. Shale is a laminated sedimentary rock that is formed by the consolidation of clay, mud or silt. Production
Jan 1, 2005
-
The Use Of Geosynthetic Clay Liners In Heap Leach Pads - IntroductionBy C. Athanassopoulos
Geomembranes have been used in the mining industry since the early 1970s in solution and evaporation ponds, tailings impoundments, and heap leach pads. Traditionally, heap leach pad lining systems ha
Jan 1, 2011
-
Development Of Sherritt's Commercial Nickel Refining Process For Low And High Iron LateritesBy D. Robert Weir, Verner B. Sefton
The reduction roast-ammonium carbonate leach-hydrogen reduction process for laterites has been under development by Sherritt Gordon for the past 20 years. The process can treat high iron or low iron l
Jan 1, 1979
-
Developing Project Cost Estimates in Volatile Markets - RETC2023By Connor Langford, Murray Gant, Ken Massé
For public organizations, preparing accurate project cost estimates is a critical component in capital project planning. Project delivery methods provide a structured approach to moving projects throu
Jun 13, 2023