Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CABy Jeremy Theys
The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu
-
Western Coal Use In Industrial BoilersBy Kenneth L. Maloney
Ten small and intermediate-sized [11 GJ/hr to 264 GJ/hr (10,000 lb/hr steam to 250,000 lb/hr steam)] coal-fired boilers in the upper Midwest have each been tested on both a bituminous eastern coal and
Jan 1, 1977
-
Performance Characteristics Of Geogrid When Used For Roof And Rib Surface ControlBy D. R. Dolinar
Geogrids can be used as surface control on both the roof and rib in underground mines to prevent the fall of small pieces of rock and material from between the primary supports. The use of screen mate
Feb 27, 2013
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Beach Sewer Tunnel Rehabilitation ? IntroductionBy Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008
-
Use Of Geologic Parameters For The Development Of Low-Grade Copper Reserves, Silver Bell Mine, AZBy Q. J. Browne, M. A. Miller
Silver Bell produces about 22,000T of fine copper annually from low-grade chalcocite and oxidized copper ore that is recovered by sulfuric acid leaching and SX-EW processing. The current mineable res
Jan 1, 2002
-
Practical Subsidence Prediction For The Operating Coal MineBy Keith A. Heasley
At this point in time, approximately 800 M tonnes (880 M tons) of coal are mined each year in the United States. Forty percent of this coal or approximately 320 M tonnes (350 M tons) is taken from und
Jan 1, 1986
-
Lake Ft. Smith Microtunneling Lake TapBy Roberto J. Guardia, Ted Lewtas, Peter Rasmussen, Klaus Winkler
As part of the Lake Fort Smith Water Supply Dam Enlargement project, located in northwest Arkansas, microtunneling methods were used to install two side-by-side,1.53m (60-in) inside-diameter steel pip
Jan 1, 2005
-
Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the AndesBy Farrukh M. Mazhar, Philippe P. Martin
Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at
Jan 1, 2003
-
TBM Data Management And Quality Assurance For The Brightwater Conveyance ProjectBy Jeffrey Mitsopoulos
King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which
-
The Use Of Sensor Derived Data In Real Time Mine Optimization: A Preliminary Overview And Assessment Of Techno-Economic SignificanceBy M. Buxton
Sensor derived data can add value across the mining operating chain ranging from resource definition, extraction, pre ? concentration, mineral process monitoring and assessment of product quality. M
Feb 27, 2013
-
Optimal Pitwall Shapes To Increase Financial Return And Decrease Carbon Footprint Of Open Pit Mines - SME Annual Meeting 2022By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL, N. Morales
The steepness of the slopes of an open pit mine has a substantial influence on the financial return of the mine. The paper proposes a novel design methodology where overall steeper pitwalls are employ
Mar 2, 2022
-
Refractory Copper Ore From Nchanga, Zambia: A Materials Characterization StudyBy O. N. Sikazwe
The Nchanga Cu-Co ore deposit of the Zambian Copperbelt, is hosted in Neoproterozoic siliciclastic-carbonate sedimentary rocks, and it consists of two orebodies: the Lower Orebody (shale) and the Uppe
Jan 1, 2008
-
Dimensioning and Construction of a Sealing Layer Made of Green Liquor Dregs Amended Till—Remediation of Sulfidic Mine Waste - Mining, Metallurgy & Exploration (2023)By J. Mácsik, J. Lindblom, C. Maurice, Susanne Nigéus
Using non-hazardous industrial residues in mine waste remediation is beneficial not only for the mining industry where substantial amounts of the waste generated have potential to produce acid rock dr
Dec 7, 2023
-
Coal Division - Mineral Resources And Mine Design In 1978Exploration of new resources and development of new equipment and designs are an ever changing facet of mining. New equipment to handle specialized operations is being developed and new techniques for
Jan 1, 1979
-
Washington Metropolitan Area Transit Authority's Experience With Contractual Relationships In Tunneling ContractsBy William S. Alldredge
The Washington Metropolitan Area Transit Authority(WMATA) officially came into existence in February 1967 after the District of Columbia, Maryland, and Virginia joined in a com¬pact pursuant to Federa
Jan 1, 1974
-
Plant Performance Improvements Using Grinding Circuit ?Classification System Efficiency??Classification System Efficiency (CSE)? is a simple, powerful concept which can be used to measure and improve ball mill circuit efficiency. This paper describes six plant case studies which demonstr
Jan 1, 2012
-
Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In BostonBy Verya Nasri
The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr
-
Fe-Mn crusts from the Central AtlanticBy José Mirão, Pedro Madureira, v Costa, Patrícia Conceição
"The exploration of seamounts south of the Azores during the EMEPC/Açores/G3/2007 campaign allowed for the collection of 30 Fe-Mn crusts from the Atlantis, Great Meteor, Small Hyeres, Irving and Plato
Sep 1, 2014
-
Use Of The Multiple Accounts Analysis Process For Sustainability OptimizationBy S. Shaw
There is an increasing requirement for mines to meet a certain minimum criteria for sustainability within the context of the physical environment, ecosystem and socio-economic system in which they are
Jan 1, 2004