Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Some problems in estimation of the optimum exploitation life of bucket wheel excavatorsBy R. Zivojinovic, S. Vujic
The structural age of the capital mining machinery, representing a part of the system of the Electric Power Industry of Serbia, has been dictated by the initiation and development of open pit coal min
Jan 1, 2003
-
Comparative legal solution for rehabilitating legacy mines through financial provision in South Africa and Western AustraliaBy J. C. N. Ashukem, F. Agyemang
One understudied area of environmental law is the socio-ecological impact of ownerless mines. This impact is particularly pronounced in resource-dependent regions like South Africa and Western Austral
Dec 15, 2025
-
An engineering classification for rocks and rock massesBy T. Ramamurthy
ABSTRACT : Rock mass classifications RMR, Q and GSI do not suggest decreasing modulus ratio with the decrease in the quality of rock. These have been linked to joint factor, Jf , for better predictio
Jan 1, 2003
-
Infacon X Organising Committee[Dr. N.A. Barcza (Chairman) Mr. R.J. Linnell (Vice Chairman) Mr. J. Basson Dr. L.A. Cramer Mr. W.A. Gericke Dr. N.C. Machingawuta Mr. C.S. Mahony Dr. L.R. Nelson Mr. D. St J. Slater
Jan 1, 2004
-
State of labour protection at coal mines analysis on the basis of economic riskBy S. G. Gendler
One of the ways of trauma and occupational diseases level reduction is noted to be the improvement of the labour protection measures planning. As an indicator for prospective trends determination in t
Jan 1, 2003
-
Copper slag as a potential source of critical elements - A case study from Tsumeb, NamibiaBy S. Lohmeier, D. Gallhofer, B. G. Lottermoser, T. Schirmer
At a time of resource consumption, it is important to study the chemical composition of mining and metallurgical wastes to prevent the dissipative loss of metals and metalloids from the mining value c
Mar 1, 2021
-
Increasing the efficiency of secondary resources in the mining and metallurgical industryBy G. Jandieri
An improved methodology is presented for assessing the economic feasibility and effectiveness of recycling industrial waste. The methodology is based on the break-even control mechanism, but at the sa
Jan 26, 2023
-
Engineering Principles for the Design of a Personnel Transportation SystemBy G. M. J. van Heerden, R. C. W. Webber-Youngman
"This article describes the re-engineering principles applied in the design of a personnel transportation system for the Bafokeng Rasimone Platinum Mine in the Rustenburg area of South Africa. It inco
Jan 1, 2016
-
Outotec Smelting Solutions For The PGM IndustryBy L. Aspola
The platinum group metals (PGMs), i.e. ruthenium, rhodium, palladium, osmium, iridium, and platinum, are typically found in association with each other, but also importantly, with nickel and copper. T
Jan 1, 2012
-
SRC rock mass classification applied to tunnels under high tectonic stressBy L. I. Gonzalez de Vallejo
SRC rockmass classification have been applied to 25 tunnels in Spain and Italy, for which it was found that much heavier supports than those estimated by the RMR index were required. SRC and RMR indi
Jan 1, 2003
-
A quantitative assessment model for the environmental load of gold production by artificial neural networkBy Z. Jin, Q. Yun, C. Lu
This paper presents a quantitative assessment model for the assessment of environmental load in gold production, which is based on environmental ecology, Life-Cycle Assessment and technical conditions
Jan 1, 2003
-
Water production as an option for utilizing closed underground minesBy P. Malíková, I. Osičková, R. Sousedíková, P. Rys, J. Dvořáček, S. Heviánková
Each mining project goes through the same life-cycle, from prospecting and exploration to closure and post-closure periods. This prompts the question whether the closure of a mine constitutes the end
Oct 1, 2022
-
The Relationship Between The Client, Clients Project Team And The EPCM Project TeamBy C. A. F. Sweet
The inter-relationship between these parties and the effect on the outcome of the project is often grossly underestimated. There are numerous success stories where the parties have worked as com
Jan 1, 2005
-
Dry processing for coal preparation: a review, N. Hughes, M. Le roux, and Q.P. CampbellBy M. Le Roux, Q. P. Campbell, N. Hughes
Water plays a significant role in minerals processing; this is especially true in coal preparation where water-based beneficiation is widely accepted and consistently delivering sharp separation effic
Jan 1, 2020
-
Density and size analysis of air separation process using MLA, M. Buchmann, T. Mütze, and F. HeinickeBy M. Buchmann, T. Mütze, F. Heinicke
Dry air classification is a well-known technique used for decades in the cement industry to separate material in the size range of 0.01-1.0 mm. Additionally, in corresponding dry grinding circuits wit
Jan 1, 2020
-
A sustainable approach to derelict and ownerless mines in South AfricaBy S. Mudau, P. Mohasoa, M. J. Cole
Derelict and ownerless (D&O) mines in South Africa have been an ongoing concern for over a decade. While some progress has been made to rehabilitate D&O asbestos sites, significant work remains, exace
Apr 25, 2025
-
Spotlight On Inf Acon 80By C. W. P. Finn
INFACON is of special significance to people in South Africa who are interested in ferro-alloys, because it was in South Africa that the idea of regular international congresses on ferro-alloys was co
Jan 1, 1981
-
Optimization of Conditions for the Preparation of Activated Carbon from Olive Stones for Application in Gold RecoveryBy M. Louarrat, G. Enaime, A. Yaacoubi, A. Baçaoui, J. Blin
"The purpose of this study is to prepare a new activated carbon from olive stones for use in gold recovery by carbon-in-leach (CIL) and carbon-inpulp (CIP). The preparation method chosen was physical
Mar 1, 2019
-
Risk-based slope design: Insights from the Thabazimbi failureBy T. Dlokweni, M. Bester, C. Koegelenberg, I. Basson
Certain degrees of safety, economic, and financial risk are implicit in any mining operation. At Thabazimbi Mine, slope stability was one of the major sources of risk, largely due to data uncertaintie
Sep 1, 2025
-
Identification of cost factors relating to mining incidentsBy E. P. Preis, R. C. W. Webber-Youngman
The real cost of any mining incident has, empirically, proven to be estimation-driven, rather than factdriven. One of the main reasons for this lies with the complexity of the cost composition of any
Jan 1, 2021