Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Limestone Fragmentation Case Study Using Regular Rhythmic Timing

    By Tristan Worsey, Jhon Silva

    The paper discusses a limestone quarry case study that looks at change in fragmentation due to using different charge sequences when using the regular rhythmic timing method.

    Feb 1, 2020

  • ISEE
    A New Way of Looking at Risk and QD Compliance

    By Lon Santis, Michael Swisdak, John Tatom

    The Institute of Makers of Explosives (IME) and A-P-T Research, Inc. (APT) have developed a quantitative risk assessment tool called IMESAFR (IME Safety Analysis for Risk) for managing risk from vario

    Jan 1, 2013

  • ISEE
    Implementation of Electronic Detonators at Barrick Goldstrike Mines, Inc

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    In March of 2001 Barrick Goldstrike Mines, Inc. began evaluating the potential benefits of electronic detonators at the Betze Post open pit gold mine. The original evaluation focused on increased frag

    Jan 1, 2004

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    Calculating Shock Wave Overpressure from High-Speed Video

    By Catherine Johnson, Kelly Williams

    Advances in high-speed video imaging make it possible to see the refraction of light due to the high-density gradient at the shock front without the need for parabolic mirrors or additional light sour

    Feb 1, 2020

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    The Importance of Proper Seismometer Coupling

    By Randy Wheeler

    In recent years the issue of seismograph calibration and accuracy has been a major focal point of the ISEE Blast Vibration and Seismograph Section. In fact, questions concerning the consistency and re

    Jan 1, 2004

  • ISEE
    AN Railcar Derailed Debris Collection – Data Analysis Update

    By Brandon Fryman, Josh Hoffman, Rhys Baker

    A post-detonation debris collection project was led in conjunction with a large ammonium nitrate (AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Admini

    Feb 1, 2020

  • ISEE
    Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for Success

    By Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta

    During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru

    Jan 1, 2017

  • ISEE
    Near-Source Attenuation of Seismic Waves from Spatially Distributed Sources

    By Lewis L. Oriard

    Both theory and experience tell us that spatially distributed energy sources generate a more complex family of seismic waves than do point sources. The resulting effects in the near field (for close-i

    Jan 1, 1992

  • ISEE
    Shock Tube Detonator Shelf Life in Relation to Timing Accuracy

    By Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey

    Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used

    Jan 1, 2013

  • ISEE
    World's Longest Highway-Tunnel Tests 'Site Sensitized Emulsion'

    By Bjoern R. Petterson, Lars Haakon Siem

    The world's longest highway-tunnel -- the Aurland Tunnel in western Norway -- is scheduled to be opened in the year 2000. A project to build a main highway between Oslo and Bergen with no ferry connec

    Jan 1, 1996

  • ISEE
    Analysis of Data Collected from Ti/Al Conical Shaped Charge Penetration of Geological Targets

    By Jason Baird, Braden Lusk, Dominique Nolan, Allen Stults

    Conical shaped charges have been used to penetrate rock for many years now. Examinations have been made looking at shaped charge liner geometry, material, and standoff, as well as explosive compositio

    Jan 1, 2012

  • ISEE
    Investigation of Cautious Blasting Model Applied During Tunneling of Kadikoy-Kartal Subway Construction

    By Ali Kahriman, Olivio Angelini, Ibrahim Sefer, Burak Ekmen, Koray Arpak, Ertugrul Kaya, Yucel Karakus, Abdullah Sak, Aziz Ozdemir

    In recent years, in order to bring solution to traffic intensity arising from transportation problems and facilitate public transportation in the modern world in paralel to urbanization and to the inc

    Jan 1, 2010

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • ISEE
    Harmonic Delamination of Nuclear Structures

    By Frederick B. Kuhnow

    Harmonic energetic delamination a building is being considered for demolition at a formerly known atomic power lab. The building is within a containment structure under a negative pressure, so that no

    Feb 1, 2020

  • ISEE
    Thiokol's Accublast Detonator: Precision Benefits the Industry can Justify

    By W B. Gregg

    "A review, update, and expansion of Thiokol’s presentation at BAl’s Fiih High Tech Seminar titled ‘ADetonator - An Era of Precision in All-Electronic Detonators” is provided herein (and should be cons

    Jan 1, 1995

  • ISEE
    Difficulties and Suggestions when Drilling and Blasting in a Karst Environment

    By James T. Ludwiczak

    Drilling and blasting in a Karst (sinkholes and mud seams) environment has long been a problem for blasters, miners, quarry operators, contractors, and developers. While one cannot change the geologic

    Jan 1, 2005

  • ISEE
    The 1998 Explosion of the Debruce Grain Elevator

    By Jerome H. Stofleth

    In June of 1998, the DeBruce Grain Elevator was devastated by an accidental explosion caused by the unintentional ignition of grain dust. The DeBruce grain elevator was the largest ‘single head-house’

    Jan 1, 2004