Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Safeguarding Historic Underground World War II Structures from Surface Quarry Blasting – a Case Study

    By Shazad Hosein, William J. Birch, Robert Farnfield, David Jameson, Catherine E. Johnson

    The current and consented quarry workings at a slate quarry in North Wales {UK} intersect old long abandoned underground slate mine workings. The old underground slate mine contains the remains of Wor

    Jan 21, 2025

  • ISEE
    Journal: 100 Years / The breakup of DU PONT

    By Robert Hopler

    On June 13, 1912, the final decree of dissolution of the DuPont explosives trust was handed down, and the resulting new companies began operating at the beginning of the new year. The property assets

    Jan 1, 2014

  • ISEE
    Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian Case

    By Dennys Huaman, Carlos Rojas

    Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different

    Feb 1, 2020

  • ISEE
    Debris Directionality Comparison: Full Scale Tests to Q/D and QRA

    By Lon Santis, Bill Evans, John Tatom

    Debris data from the Department of Defense Explosives Safety Board’s Project ESKIMORE full-scale explosives event test program are compared to quantity-distance (Q/D) standards and quantitative risk a

    Jan 1, 2015

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Anthony Konya, Calvin J. Konya

    This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d

    Feb 1, 2020

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    The new technology presented in this paper is a patented system that is installed on board excavators (backhoe or front shovel types). Several control points are set along ore/waste contacts and their

    Feb 1, 2020

  • ISEE
    AL/AN/FO Optimum Formulation

    By Yessica Idrogo

    "Undoubtedly mining is currently the activity that brings a great development for all countries involvedin this industry, which means that to develop mining requires adequate explosive mixtures. The f

    Jan 1, 2017

  • ISEE
    Half a Century of Service in the Interests of Explosives

    By J E. (Boet) Coetzee

    SAFEX International, as the name suggests, is a global organisation, which has the fundamental objective of improving the safety of operations concerned with the manufacture, storage, transport, and u

    Jan 1, 2005

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    In this paper, CFD was used to investigate the blasting toxic fume characteristics under different entrapping percentages and under changing muck pile properties like broken rock size and porosity. It

    Feb 1, 2020

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping Operation

    By Alexandra Yuyali

    The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o

    Jan 21, 2025

  • ISEE
    Ionomer Resins for Higher Performance Shock Tubes in Open Pit Mining Applications

    By K. Hausmann, P. A. Sashin, G. J. Prejean

    Misfires caused by unreliable shock tube constructions can have significant cost implications and place field workers at serious risk during remediation. Ionomer materials, used as a subtube in shock

    Jan 1, 2011

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018

  • ISEE
    Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)

    By Sandy Tavelli, Thomas L. Barkley

    This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004

  • ISEE
    Blast Optimization from Drone Imagery

    By Markus Pötsch, Andreas Gaich

    Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective

    Feb 1, 2020

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020