Blast Vibration and Seismograph Section - Location, Location, LocationBy Kenneth Eltschlager
Business says that location is a primary component of being successful. So too is the importance of location in blasting. For blast seismograph data to be useful, the location of the blast and seismog
Jan 1, 2004
-
Cost Optimization for Controlled Blasting, Transportation and CrushingBy Taner Sumer, H Altay Guvenir
Fragmentation in rock quarries is tried to be achieved by changing the specific charge, drill pattern and bore hole diameters by different experts. This paper is a brief summary consisting of the util
Jan 1, 1993
-
Numerical Modeling of the Circular-Cut using Particle Flow CodeBy Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee
The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut
Jan 1, 2005
-
Reduction in Total Blasting Cost of Mine Using Electronic DetonatorsBy Narendra Gupta, Gaurav Srivastava, Abhinav Sharma
From the days when plain detonators and safety fuse were used for initiation of commercial explosives, the commercial blasting and mining industries have made rapid strides. With the advent of electro
Jan 1, 2015
-
Function Analysis of Stemming DevicesBy Carl Lubbe, Ron Frye
Numerous articles have been written regarding the effects of blast control plugs in an attempt to quantify stemming ejection rates, air overpressures, fragmentation’and other parameters measured using
Jan 1, 1998
-
Reliability of Timing Sequence Network for Multiple Blast HolesBy Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography SystemsBy Laura Bustemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can
Jan 1, 1998
-
Top Hammer Drilling-The Way Things WorkBy William D. Hissem
For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.
Jan 1, 1998
-
Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field ControlsChoosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra
Jan 1, 1998
-
Shape Charge DesignBy David Cole, Paul Cooper, Dale Preece, Jerome Stofleth
The Explosive Destruction System (EDS) has been designed at Sandia National Laboratories for the disposal of chemical munitions (phosgene, mustard gas, sarin etc.), many dating back to World War I. ED
Jan 1, 2002
-
Evaluation and Selection of Blasthole Drilling Equipment Based on Application and Overall CostBy George D. Raitt
Anyone who has spent any time in and around the drilling and blasting profession knows that probably the most critical part is the drilling portion. A blasthole is nothing more than a cylindrical vehi
Jan 1, 1990
-
*Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting ParametersBy A. Karadogan, G. Tuncer, A. Kahriman
Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi
Jan 1, 2005
-
Modeling Vs. Monitoring Blast Movement: The Cost of VariationBy Will Hunt, Darren Thornton
In March of 2013, an undisclosed gold mine (MINE X), located in the Western United States, performed blast movement monitoring of three blasts occurring in one of two active pits. Blast Movement Monit
Jan 1, 2014
-
The 9th International Symposium on Rock Fragmentation by Blasting, Fragblast 9, 14-17th of September 2009, Granada, SpainBy Agne Rustan
The 9th International Symposium on Rock Fragmentation by Blasting was held in the Granada Conference Centre, Granada, Spain from the 14th - 17th September 2009. The Symposium was preceded by a 1 ½ day
Jan 1, 2009
-
Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced SeismicBy Wenbo Lu
A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua
Jan 1, 1999
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock MinesBy Reinhold Schnell, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e.,metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the over
-
Electrodet a New Precise, Reliable, Easy to Use and Cost Effective Electronic Delay Detonator SystemBy Noel Dent
Increasing interest is being expressed in the development and availability of Electronic Delay Detonators throughout the world. Particularly in open-cast mining, the benefits associated with precise,
Jan 1, 1994
-
SEE Education Foundation (Scholarship Awards - 2004)By N/A N/A
Aw a rd winners from the University of MissouriRolla. Back row from left: Seok Bin Lim, Chris B o l l i n g e r, Adam Kre s l e r, Scott Geer, Joseph Cohn, and James (Buck) Hawkins; Front ro w f rom l
Jan 1, 2004
-
Methods of Evaluating and Predicting FragmentationBy Claude Cunningham
The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage
Jan 1, 1995
-
Tall Structure Response to Close-in Urban Blasting in New York City – Part 2By Cathy Aimone-Martin, Caitlin Woznick, Brent Meins
This study is a continuation of previous work in which the responses of tall structures to close-in construction blasting at two rock excavation sites are evaluated. A total of eight buildings were in
Jan 1, 2015