Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Earth Pressure Distribution On Diaphragm Wall During ExcavationBy Ting Chinsu
Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm
Jan 1, 1991
-
The Role Of Real-Time Instrumentation In Large Infrastructure ProjectsBy J. G. La Fonta
The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be
Jan 1, 2006
-
Recent Advances in Quiet & Vibration-less Steel Pile InstallationBy R. K. Filip
"Steel bearing piles have long been used to carry high compressive, tensile and lateral loads. Such piles are most commonly tubular or ""H"" profile and are typically installed using percussive techni
Jan 1, 2005
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin
"Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca
Jan 1, 2017
-
Granular Pile For Ground Improvement ? SynopsisBy G. Ranjan
The designers and the practicing engineers have started using latest and cost effective techniques of ground improvements which utilise the weak and poor sub-soil deposits efficiently for the civil en
Jan 1, 2010
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
Uncertainties In CSL Test Interpretations And Recommendations Toward A More Efficient ProcessBy Rohrbach
Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, secan
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
You Can't Drive Piles Because Of The VibrationBy Jerry A. Steding
How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he
Jan 1, 1988
-
Dynamic Load Testing Of Augered Cast-In-Place PilesBy Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep FoundationsBy Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris
Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL
Jan 1, 2019
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e