Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    3D FEM Modelling of a Ground Improvement Solution

    By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim

    A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo

    Sep 8, 2021

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
    Pile-Supported Raft Foundation System

    By Emre Biringen

    Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve

  • DFI
    After Sandy: Bay Park Sewage Treatment Plant Flood Protection

    By David Guy, John Stanbury, Gilbert Tallard

    "In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage

    Jan 1, 2016

  • DFI
    An Alternative Approach for Estimating the Vertical Capacity of L-Shaped Segmental Underpinning Systems in Urban Basement Construction

    By Abid O. Adekunte, David Greentree, David Hilton

    "The construction industry is witnessing an upsurge in demand by property developers to have basements incorporated into their residential and commercial development schemes. This is attributable to p

    Jan 1, 2016

  • DFI
    Integrity Testing Methods

    "Integrity tests refer to a variety of non-destructive tests (NDT) whose purpose is to measure or determine the quality and uniformity, and some- times dimensions, of cast-in-place concrete foundation

    Jan 1, 2004

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2013

  • DFI
    Today’s Connectivity: Using Historical Data to Anticipate Future Risk

    By Michael Frawley, Deana Ruud, Jessica Turner

    Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po

    Jan 1, 2019

  • DFI
    A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge Test

    By Chengcan Wang, Jin-Tae Han, Young-Eun Jang

    "The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key

    Jan 1, 2016

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable Soils

    By Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain

    "An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i

    Jan 1, 2015

  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Drilled Shaft Load Testing Program for Design of Foundations for an Automated People Mover

    By Samer Rabab’ah, John C. Niedzielski, Jason Valeria

    The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f

    Jan 1, 2019

  • DFI
    Slope Stabilization of Mill Creek Landslide Using Steel H-Piles

    By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis

    "Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2

    Jan 1, 2015

  • DFI
    Ground Improvement for Underground Construction in South Florida

    By Christopher Sammon, Nicholas Turus

    "The demand for underground parking in South Florida has increased as a result of changes to the local building code, coupled with developers’ desire to improve building aesthetics and provide much ne

    Jan 1, 2017