Innovative Design for Retaining Structures using Combined ProductsBy Clifford Taylor, Alexander Zöhrer
"The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such
Jan 1, 1900
-
Helical Pile Foundation Solution for Landfill RedevelopmentBy Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021
-
Forensic Evaluation Of Bored Piles For A Factory Project At JhajjarBy Sanjay Gupta, Sorabh Gupta, Ravi Sundaram
A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo
Sep 1, 2022
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Foundations Of Self Drilling Micropiles In 4G And 5G Network Telecom Masts In IndiaBy Annika Gram, Teddy Johansson, Lutfi Ay
Micropiles transfer tension or compression forces as well as cyclic loads into the ground via skin friction. The Self Drilling Micropiles (SDM) can be utilized for permanent applications. The hollow b
Nov 1, 2022
-
Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber OpticsBy Peter Faust, Peter Hubbard, Kenichi Soga
The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has
May 1, 2022
-
Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway UpgradeBy Henry Zhang
This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re
Nov 1, 2022
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
An Unique Formula for the Stone-Column Group EfficiencyBy Abhijit Saha
"The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction
Jan 1, 2015
-
Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform DesignBy Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys
A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve
May 1, 2022
-
Fresh Concrete Pressure in Cast In-Situ Bored PilesBy Matthias Pulsfort, Hanna Nissen, Markus Herten
An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke
Sep 8, 2021
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NYBy Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand
"The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The
Jan 1, 2016
-
Quality Control And Estimation Of Axial Resistance By Using An Expander Body, A Large-scale PressuremeterBy Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci
This paper describes the general principles of the expander body with post-grouting (EBI) system, and how it is similar in nature to a large-scale pressuremeter device. The results from the installati
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage StructuresBy Ramanathan C, Prasad P. V. S. R
The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph
Sep 1, 2022
-
The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed TunnelBy J. S. Lee, R. K. Massarsch
"A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o
Jan 1, 2015