Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Calibration of the Gates Pile Driving Equation for LRFD in Louisiana

    By Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung

    "The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w

    Jan 1, 2017

  • DFI
    Seismic Rehabilitation Of Seattle's Pier 69

    By David Pierce

    The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie

    Jan 1, 1992

  • DFI
    Safe Load Of A Single Pile In Earthquake Loading - Synopsis

    By Shamsher Prakash

    Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t

    Jan 1, 1996

  • DFI
    High Capacity Grouted Helical Piles

    By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar

    "Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d

    Jan 1, 2016

  • DFI
    The Keys to Success in Waikiki

    By Alison Savage, Michael Terry

    "For decades, the International Market Place (IMP) has been an icon in the heart of Waikiki in Honolulu, Hawaii. It was famous for Duke Kahanamoku’s restaurant where people flocked to hear Don Ho sing

    Jan 1, 2016

  • DFI
    Challenges And Recommendations For Quality Assurance Of Deep Foundations

    By Frank Rausche

    Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,

    Jan 1, 2008

  • DFI
    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    Intelligent Pile-Driving With A Diesel Impact Hammer

    By Michael D. Justason

    This paper describes the technology behind the development of an automated energy control system for a diesel pile hammer. Some background is given on experience using an energy monitoring system on

    Jan 1, 2006

  • DFI
    Deep Compaction Using Vibratory Pile Hammers

    By Dennis Nottingham

    The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer

    Jan 1, 2013

  • DFI
    Design And Installation Of Pressure-Grouted, Drilled Displacement Piles

    By Willie M. NeSmith

    The use of drilled (screwed) displacement piles is an emerging sector of the United States deep foundation industry. During installation of these systems, a Ko to Kp environment is created in the mate

    Jan 1, 2002

  • DFI
    Vertical Load Carrying Capacity Of Concrete Expanded Base Piles

    By Mustapha Zergoun

    This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,

    Jan 1, 2004

  • DFI
    Micro-Pile Foundations in Difficult Subsurface Conditions

    By D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya

    "Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav

    Jan 1, 2005

  • DFI
    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    Performance Specifications For Drilled Piles

    By Dan Brown

    Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative

    Jan 1, 2006

  • DFI
    Time-Dependent Increase Of The Bearing Capacity Of Displacement Piles

    By Florian König

    It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl

    Jan 1, 2006

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013

  • DFI
    Soil Mixing And Jet Grouting Ground Improvement Under Tanks

    By Lisheng Shao

    Soil mixing and jet grouting have been widely used to support heavy structures such as tanks, cement silos, and storage buildings. Although the installation methods vary between soil mixing and jet g

    Jan 1, 2010

  • DFI
    Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity Piles

    By W. G. K. Fleming

    Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m

    Jan 1, 1991

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASING

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007