Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Lithogeochemistry as a guide to identifying favourable areas for tile discovery of volcanogenic massive sulphide deposits

    By V. J. Sopuck, O. P. Lavin, Ian Nichol

    "A major challenge of contemporary exploration geochemistry is the development of procedures that can locate blind mineralization or mineralization that sub-crops below a cover of transported overburd

    Jan 1, 1980

  • CIM
    Purification of solid from secondary aluminum smelting dross

    By J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.

    Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,

    Jan 1, 2005

  • CIM
    Paleoproterozoic Age Relationships in the Three Bluffs Archean Iron Formation-Hosted Gold Deposit, Committee Bay Greenstone Belt, Nunavut, Canada

    By D. W. McDonald, L. M. Heaman, R. A. Creaser, T. Davies, T. Chacko, A. Simonetti

    "The Three Bluffs gold deposit is located in the Committee Bay greenstone belt, which forms part of the Rae domain of the western Churchill province, Nunavut, Canada. Gold mineralization is hosted by

    Jan 1, 2009

  • CIM
    Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility

    By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke

    "The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • CIM
    An Overview of the Oil Sands Process, Comparing it to Conventional Mineral Processing

    By Gavin Ritson, Chris Ward

    "The oil sands industry is still fairly young with the first viable oil sand operation having been started in Alberta in 1960. Since then numerous modifications and improvements have been tried and im

    Jan 1, 2009

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • CIM
    Textural Analysis Provides Clue to Poor Ground Conditions in a Saskatchewan Potash Mine

    By A. Dave Mackintosh

    In 2001, at the CIM AGM in Quebec, a paper discussing poor ground conditions in a newly opened area at Agrium?s Vanscoy Potash Operation?s, suggested load transfer around old workings as a possible re

    Apr 1, 2005

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream Area

    By K. G. Thorne, M. J. McLeod, D. Hoy

    "Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col

    Jan 1, 2008

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Enhancements in the interpretation of geochemical data using multivariate methods and digital topography

    By E. C. Grunsky, B. W. Smee

    "The development of low-cost, rapid multielement analytical techniques has generated large geochemical databases in many exploration programs. When a sampling program consists of several thousand samp

    Jan 1, 2003

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Electric-Pulse Disaggregation (Epd), Hydroseparation (Hs) and Their Use in Combination for Mineral Processing and Advanced Characterization of Ores

    By Vladimir N. Rudashevsky, Louis J. Cabri, Nikolay S. Rudashevsky, Thomas Oberthür

    "EPD (Electric Pulse disaggregation) and HS (hydroseparation) are exceptional technologies for research, concentration, evaluation, and mineral extraction of specific minerals such as precious metals

    Jan 1, 2008

  • CIM
    Development of Autoclave Technology

    By M. J. Collins

    "Autoclaves were first used in the metallurgical industry in 1893 to recover alumina from bauxite. In the 1940s and 1950s, several high temperature and pressure processes were invented in the laborato

    Jan 1, 2018

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Ivanhoe New Horizons

    By Jess Harding

    Oyu Tolgoi investment agreement now in full, legal effect Successful completion of a series of conditions to 2009 Investment Agreement was announced March 31, 2010. Full-scale construction now set t

    May 1, 2010

  • CIM
    The use of near surface materials in gold exploration Kirkland Lake area, Ontario

    By V. N. Rampton, C. F. Gleeson

    "Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w

    Jan 1, 1987