Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study

    By M. C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles an

    May 1, 2005

  • CIM
    Engaging Local Communities and Sustainable Social Development

    By Dina M. Aloi

    In today?s evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to ?engag

    May 1, 2007

  • CIM
    Supporting Robust Strategic Underground Mine Decision-Making

    By Tarrant Elkington

    Underground mine planning practices are typically manual and time consuming and will often produce sub-optimal solutions due to the application of generic rule-of-thumb assumptions or ?tried and teste

    May 1, 2010

  • CIM
    Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatments

    By L. Salnais

    "Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti

    Jan 1, 1988

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Mining Methods and Costs at the Josephine Mine

    By Alan E. Gallie

    One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i

    Jan 1, 1947

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)

    By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle

    "Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a

    Jan 1, 2005

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Survival strategy: every bit counts

    By O. P. Garg

    "The Iron Ore Company of Canada (IOC) operations in Labrador and Quebec, in Canada, is among the largest openpit mining complexes on a world wide basis. Since the 1981-82 recession, IOC has embarked o

    Jan 1, 1987

  • CIM
    The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)

    "The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often

    Jan 1, 2013

  • CIM
    A Step back in time to Hand-Held Mining for Profitability

    By Mike Turner

    The Otter-Juan mine was closed by WMC Resources? Kambalda Nickel Operations (WMC-KNO) in 1999 due to the combined effects of low Nickel prices and high mining costs. GBF Mining Pty Ltd purchased Otter

    May 1, 2004

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • CIM
    Improving Safety With GPS-Based Proximity Detection Improving Detection

    By Casey Erickson

    Goldstrike Property ??Located in Elko, NV USA?Carlin Trend ??Mining Since 1985 ??27 Million Ounces of Gold Mined ??Production of 400,000 tons/day ??1,600 Employees

    May 1, 2011

  • CIM
    A Review of Rare Earth Mineral Processing Technology

    By Jack Zhang, Chuck Edwards

    "The versatility and specificity of rare earth elements (REEs) have led to their use in an ever increasing variety of applications in new technologies. Consequently, demand for REEs has increased sign

    Jan 1, 2012

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity

    By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss

    "Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid

    Jan 1, 2004

  • CIM
    Operation of Enviro Clear Thickeners in Series as CCD Units

    By L. W. Hamel

    "Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and

    Jan 1, 1979