Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Lonmin Platinum Base Metal Refinery Operations and Continual Improvements 1985 To 2012By M. Turner-Jones, N. Steenekamp
"The Lonmin Base Metal Refinery treats converter matte from the Lonmin Smelter to produce nickel sulphate crystals, copper cathode as well as a concentrate containing the platinum group (PGM) metals.
Jan 1, 2012
-
A Retrofit Method for a Dravo-Lurgi Iron Ore Induration Furnace to Reduce Fuel Consumption and GHG Emissions 2011Background ArcelorMittal?s (formerly QCM?s) Port Cartier iron ore pelletization operations 2 side-by-side induration furnaces each producing 578 t/h of cured pellets Firing No. 6 fuel oil and coke
May 1, 2011
-
Dry drilling in underground productionBy E. M. De Souza
"A scientific testing program, sponsored by the Mining Industry Research Organization of Canada (MIROC), was undertaken on the surface and underground facilities of Inca's Crean Hill Mine to inve
Jan 1, 1992
-
Shareholder Value in Mining: The Shifting SandsBy Mauro Chiesa
A. New Dictionary, Since 2007/8 Traditional concept of ?cycle? is dead A dearth of projects AND good metal prices suggests otherwise In a depletion-business, good times for any greenfields in 2-3
May 1, 2013
-
Flotation of Ultra-Fine Scheelite Particles Assisted By NanobubblesBy L. Zeng, Q. Feng, Z. Qiu, L. Ou, Central South University
It is well-known that the use of nanobubbles can significantly improve the flotation efficiency of ultra-fine particles. However, this is mainly focused on coal and phosphate rock flotation. In the fi
Jan 1, 2016
-
Raise Drilling and Equipping a 1,892 Metre Deep Service Shaft in ZambiaBy B. Burger, T. Bester, S. Deonarain, L. S. Schultz
"This paper details the process followed to raise drill and equip a 6.1 metre diameter vertical service shaft at Glencore’s Mindola Deeps project in Kitwe, Copperbelt Province, Zambia. The project sco
Jan 1, 2019
-
The Amulet Mine, Que.By H. C. Cooke
Those who have followed the geological developments in connection with the copper deposits of Quebec will recall that on many properties the sulphide bodies occur as replacements of fault breccias or
Jan 1, 1930
-
Recent developments in the zinc plant of the Hudson Bay Mining and Smelting Company LimitedBy G. J. Desroches
"In order to improve zinc plant productivity, areas of low efficiency were identified. As a result, solution purification was improved, additional dust precipitator capacity was made available and a n
Jan 1, 1988
-
The Effect of Plastic Strain at Coiling Temperatures on the Hardness of Grade 483 (X70) SteelBy J. Lu, J. B. Wiskel, D. G. Ivey, E. Niemi, H. Henein
Simulated TMCP using a Gleeble was undertaken to evaluate the effect of the austenite to ferrite cooling rate, coiling temperatures of either 400°C or 500°C and the magnitude of plastic deformation at
Jan 1, 2005
-
Structure of the Yellowknife Greenstone Belt, Northwest TerritoriesBy I. C. Brown, J. F. Henderson
"IntroductionThe Yellowknife greenstone belt lies along the west side of Yellowknife bay on the north shore of Great Slave lake, some 600 miles north of Edmonton, Alberta. The producing gold mines alo
Jan 1, 1950
-
Preston East Dome MineBy J. E. Hawley, R. C. Hart
"The Preston East Dome gold mine is in the southeastern part of Porcupine district, Ontario, 5 miles southeast of Timmins, and immediately south of the property of Dome Mines, Limited.The claims now o
Jan 1, 1954
-
Kiruna Electric-a technological breakthrough in inclined ore haulageBy B. Morrison
"The Kiruna Electric System is a recently developed inclined ore haul age system for underground mining operations. Although an initial investigation was carried out at the Swedish underground iron or
Jan 1, 1989
-
Finite Element Simulation of Anisotropic Damage Around Pressurized Boreholes in Prefractured ShaleBy C. Arson
"Optimizing hydraulic fracture injection parameters in order to maximize hydrocarbon extraction and to avoid extensive borehole spalling is still an open issue. In this paper, the Differential Stress
Jan 1, 2015
-
The Geological Survery of CanadaBy F. W. Gray
Foreword: It is not my purpose, in this address, to write the history of the Geological Survey of Canada, which has from time to time been reviewed by the officers of the Survey itself, and by men m
Jan 1, 1932
-
Stratigraphy, Mineralogy, Geochemistry, and Genesis of the Au-Rich Volcanogenic Massive Sulfide (Vms) System from the Bate Verte Peninsula, NW Newfoundland, Canada: The 1806 Zone As An Example From The Ming Mine, Rambler CampBy P. J. Sylvester, S. J. Piercey, S. Maloney, S. M. Brueckner, L. Pilgrim, D. Hyde, G. Ogilvie
The 1806 zone is part of a Au-rich volcanogenic massive sulfide deposit at the Rambler Camp on the Baie \/erte Peninsula, northwestern Newfoundland, and is characterized by high Au grades (3.97 g/t),
Jan 1, 2011
-
Improving the Performance of the Hardy Cross Algorithm for Large Ventilation Models"The Hardy Cross algorithm offers a reliable method of solving network systems of fluid flow and has become widely used for solving water and ventilation flow networks. A limitation is that computatio
Jan 1, 2019
-
A Method for Determining the Long-Term Strength of EvaporitesBy M. S. King
"A simple method is proposed for determining the long-term deformation behaviour of evaporites. The theory developed can be tested by measuring the change in diameter as a function of time of a vertic
Jan 1, 1971
-
Education and Careers Mineral IndustryBy V. C. Wansbrough
First, permit me to say with what very great pleasure we find ourselves assembled in this most ancient and honourable city of Quebec. It is a city which we deeply respect as the fountain-head of the c
Jan 1, 1951
-
Variance of Intact Rock Strength Determined by Triaxial TestsBy J. Muralha, L. Lamas
"Given the results of triaixial tests, regressions are commonly used to evaluate the parameters of failure criteria that model intact rock strength and to perform statistical inferences used to evalua
Jan 1, 2015
-
The new H-W orebody-cutoff grades and mine economicsBy Bruce K. McKnight
"The new H-W orebody was evaluated by considering its production at three technically feasible rates. Capital and operating costs were estimated f or each rate and production sequences were establishe
Jan 1, 1987