Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Origin of the Copper Mountain Ores

    By V Dolmage

    Copper Mountain is the third largest copper mine in British Columbia, and is now producing close to 20 million pounds of copper per year, with which is recovered also 4,000 ounces of gold and. 13,800

    Jan 1, 1929

  • CIM
    Microbial Succession and Regulation during Heap Bioleaching of Copper Sulfides

    By H. Y. Sun, Q. Y. Tan, X. P. Niu, L. Li, Y. Jia, R. M. Ruan

    During bioleaching processes of sulfide minerals, the sulfide minerals act as the natural habitats for acidophiles, of which, most are autotrophic iron and sulfur oxidizing microbes. These microbes ac

    Jan 1, 2019

  • CIM
    Design of a Slurry Loop for Cuttings Transport Studies in Hard Rock Drilling Applications

    By M. Kamyab

    Transportation of fluid and slurry (fluid and solid particle mixtures) in a pipe and annulus space has been the focus of numerous studies. There are different parameters to be considered when studying

    Aug 1, 2013

  • CIM
    Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF Concentrator (CIM Journal | Vol. 2, No. 4)

    By F. Bourgeois, J. -S. Kroll-Rabotin

    ABSTRACT: Falcon concentrators are enhanced gravity separators designed for concentrating fine particles. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one key

    Jan 1, 2011

  • CIM
    Laboratory and Miniplant Studies on Cu/Ni Separation

    Inco Limited has been evaluating options for streamlining the overall flowsheet at its Sudbury, Ontario operations to improve productivity and to minimize the cost of at¬mospheric emissions reduction.

    Jan 1, 2005

  • CIM
    Improvement of Penetration Prediction in TBM-Tunneling by Performing on-Site Penetration Tests

    By K. Thuro, L. Wilfing, H. Kasling

    "In mechanized tunneling, performance prediction is a crucial issue for estimating excavation costs and construction time of a tunnel project. The aim of this work is to compare the calculated paramet

    Jan 1, 2015

  • CIM
    High Grade Concentrate from a Low Grade Silicate Laterite Ore via Microwave Vacuum Reduction Roasting

    By J. Forster, C. A. Pickles, Mackowiak. K.

    The future development of nickel laterite deposits is crucial with regards to satisfying impending nickel demands. The commercial implementation of new hydro/pyrometallurgical processes in recent year

    Jan 1, 2015

  • CIM
    Temperature Gradients in Ontario and Quebec

    By A. D. Misener, L. G. D. Thompson

    "IntroductionIt was shown by work previously reported that reliable geothermal gradients representative of various regions of the earth's, surface could he obtained from extended surveys of the rock t

    Jan 1, 1950

  • CIM
    Mine Evaluation and Production Scheduling (MEPS)

    By H. C. W. Bosman

    "Over the past five years, contributions from geologists and mining engineers were instrumental in the successful development of MEPS. It is a system of FORTRAN programs specifically designed to be us

    Jan 1, 1973

  • CIM
    Comparing Refractory Gold Ore Pre-Oxidation Using Mintek's Advanced Leach Facility

    By S. J. van Rensburg

    Competition for resources, including water and arable land, refocused attention on water and gold tailings management with respect to quantity and quality. MINTEK established and validated an "Advance

    Jan 1, 2011

  • CIM
    Bioleaching of Pyrrhotite Tailings for Ni Extraction- Insights into an Adaptive Evolution Study

    By Cheryl Devine, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg

    The microbial-mediated recovery of valuable metals locked in mining wastes presents an economical alternative to conventional hydrometallurgical processes. The present study investigated the bioleachi

    Jan 1, 2015

  • CIM
    Maximisation des revenus et du rendement financier par l'optimisation de l'information, de la planification et des pratiques minières

    During the past 10 years, research work to improve the survey of stope limits after mining supplied useful information, particularly for large open and sub-level stopes, regarding waste dilution cause

    Jan 1, 2005

  • CIM
    The Effect of Shot Peening, and Shot Peening and Stress Relief, on the Fatigue Properties of SAE 1080 Steel

    By N. B. Brown

    ABSTRACT The effect of a low4emperature stress relief at 232.2°C. (450°?F.) on the fatigue properties of shot-peened SAE. 1080 steel has been investigated. Specimens of the steel were first annealed.

    Jan 1, 1951

  • CIM
    An evaluation of genetic models for gold deposits of the Bousquet District, Quebec, based on their mineralogic, geochemical, and structural characteristics

    By Claude Hubert, Alex C. Brown, Pascal Marquis, D. M. Rigg

    "Numerous studies of the Bousquet mining district, Abitibi, Quebec, mainly following the successive discoveries of new gold deposits over the past two decades, have led to a broad range of genetic hyp

    Jan 1, 1990

  • CIM
    Demand and production potential of coal in Canada

    By A. Darragh

    "Past Growth The Canadian coal industry has grown rapidly during the past two decades. Coal production increased over four-fold between 1965 and 1982; consumption almost doubled, imports remained rela

    Jan 1, 1985

  • CIM
    Comparison of Two Failure Criteria for the Assessment of Haulage Drift Stability Using Stochastic Analysis and Numerical Modelling

    By Wael Abdellah

    Mine haulage drifts are the primary access to the mining blocks of an orebody in a multilevel mining system of a tabular ore deposit. The stability and functionality of haulage drifts are thus crucial

    Jun 1, 2012

  • CIM
    Automatic Control of Grinding Circuit at East Malartic Part 1

    By A. Gillis, J. Keyes

    "This is a prelirr1inary report on automatic control at East Malartic Gold Mines.After installation of the cyclones in the East Malartic grinding circuit, the interest was aroused in the automatic con

    Jan 1, 1965

  • CIM
    Study of Elemental Sulfur Formation in the Fluid Bed Dryer Baghouse

    By J. Lui

    Inco Copper Cliff Smelter commissioned two new Inco flash furnaces in 1991/1993 as part of its S02 abatement program. Each flash furnace is equipped with a fluid bed dryer. The ~ 12 wt% water content

    Jan 1, 2007

  • CIM
    Managing the Reproducibility Level of Reported Metal Recoveries

    "The content of production reports has its origins in raw measurements taken in harsh production environments. The ensuing measurement/estimation errors always affect reproducibility such that, regard

    Jan 1, 2016

  • CIM
    Noranda's Bell Allard pastefill plant: commissioning and beyond

    By Maureen McGuiness

    "The pastefill circuit at the Bell Allard Mine in Matagami, Quebec started up in August 1999. The surface pastefill plant produces a cemented paste which is sent underground by gravity through a verti

    Jan 1, 2002